Log:
Évaluations - 2, GPA: 4.5 ( )

Instructions Agri-Fab, Modèle 45-0346

Fabricant : Agri-Fab
Taille : 1.32 mb
Nom Fichier : 45-0346.pdf
Langue d'enseignement: enesfr
Aller à la télécharger



Facilité d'utilisation


Do not tighten yet. See figure 11. (G) 5/16" NYLOCK NUT(D) 5/16" x 1" HEX BOLT(O) ANGLEBRACKET FIGURE 8 REAR VIEW 16. Assemble the wheels to the axle bracket using a shoulder bolt (A) and a 3/8" nylock nut (F) for each wheel. Tighten. See figure 9. (F) 3/8" NYLOCK NUT(A) SHOULDER BOLT FIGURE 11 FRONT VIEW 19. Fasten the hitch mount arms to the outside of the angle brackets at the front of the tray using two 5/16" x 1" hex bolts (D) and 5/16" nylock nuts (G). Tighten and then loosen the nuts 1/4 turn. See figure 12. (D) 5/16" x 1" HEX BOLT(G) 5/16" NYLOCK NUT FIGURE 9 REAR VIEW 17. Assemble the hitch arms to the outside of the hitch arm mount brackets. Use two 5/16" x 1" carriage bolts (E) and 5/16" nylock nuts (G). Do not tighten yet. See figure 10. FIGURE 12 FRONT VIEW ENGLISH 25. Assemble the lift handle through the tray and attach it to the hitch arm mount bracket assembled to the axle bracket. Use a 5/16" x 1" hex bolt (D) and a 5/16" nylock nut (G). Tighten. See figure 15. 26. Position the hitch arm mount bracket so that there is side tension on the lift handle when it is locked in the up position. Tighten the nuts. See figure 15. 27. Assemble the grip (Q) onto the end of the lift handle. See figure 15. 20. Turn the aerator right side up and assemble the front ends of the hitch arms together using two 5/16" x 1-1/4" hex bolts (C) and 5/16" nylock nuts (G). Do not tighten yet. See figure 13. 21. Assemble the two hitch brackets to the top and bottom of the hitch arms using two 5/16" x 2" hex bolts (B) and 5/16" nylock nuts (G). Do not tighten yet. See figure 13. 22. Assemble the 3/8" hitch pin (J) through the hitch brackets and secure it with a 1/8" hair cotter pin (I). See figure 13. (G) 5/16" NYLOCK NUT(D) 5/16" x 1" HEX BOLTLIFT HANDLE(T) GRIP (G) 5/16" NYLOCK NUT(I) 1/8" HAIRCOTTER PIN(C) 5/16" x 1-1/4" HEX BOLT(B) 5/16" x 2" HEX BOLT(J) 3/8" HITCH PIN(G) 5/16" NYLOCK NUT FIGURE 13 FRONT VIEW 23. Tighten the bolts and nuts assembled in step 20. Tighten the bolts and nuts assembled in step 21. Tighten the bolts and nuts assembled in step 18. Tighten the bolts and nuts assembled in step 3. Tighten the bolts and nuts assembled in step 17. 24. Assemble a hitch arm mount bracket to the axle bracket using two 5/16" x 1" carriage bolts (E) and 5/16" nylock nuts (G). Do not tighten yet. See figure 14. FIGURE 15 REAR VIEW (E) 5/16" x 1" CARRIAGE BOLT(G) 5/16" NYLOCK NUT FIGURE 14 REAR VIEW ENGLISH OPERATION Aerating involves cutting small holes in the soil to create small reservoirs that will bring oxygen, fertilizer and water down into the root zone. For best performance of the spike aerator attachment, the following lawn preparation and aerator operation is recommended. Spike points are sharp. Exercise caution at all times when spike points are rotating or when points are being handled. 1. To level the spike tray after the aerator is attached to the tractor hitch, loosen the nylock nuts holding the hitch mount arms to the brackets at the rear of the tray. Make the tray as level as possible and then retighten the nuts. See figure 16. HITCHMOUNTARMS NYLOCKNUT FIGURE 17 FIGURE 16 MAINTENANCE 2. The spike tray may be raised to the transport position by pushing the lift handle backward. 3. The spike tray may be lowered to the working position by moving the lift handle forward. 4. Mow the lawn and remove loose clippings prior to use of the aerator. 5. Start the tractor engine with controls in neutral and then place throttle at a slow engine speed. 6. Engage the shift lever in lowest possible forward speed and then lower the aerator, allowing spike points to enter the ground. Increase speed as conditions permit. 7. Aerate in the straightest line possible. 8. Make overlapping passes to increase density of the spike point pattern. 9. To prevent damage to lawn, do not make sharp turns while spike points are engaged in ground. 10. Aerate in an up and down direction on slopes. 11. To increase depth of spike point penetration, add weight to the tray as necessary. The tray holds concrete blocks or patio blocks at approximately 35 lbs. each. Secure the weights with straps or wire using the holes in the tray flange. See figure 17. 12. If the ground is extremely hard and dry, it should be sprinkled or watered down for one to two hours prior to use of the aerator. 13. Do not aerate if the ground is too wet (muddy). 1. Before each use check all nuts and bolts for tightness. 2. Lubricate wheels as needed. 3. If rust appears on shield or spikes, sand lightly and coat with enamel paint. 4. Store in a dry area and coat exposed metal with light oil when not in use. 5. Spike points can be periodically sharpened with a small grinder to maintain good soil penetration. Points should be removed for sharpening. ESPANOL NORMAS DE SEGURIDAD Cualquier equipo movido por motor puede causar lesiones si se opera inadecuadamente o si el usuario no entiende como debe operarlo. Mantengase atento y cauteloso siempre que opere el equipo. PRECAUCION...


Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories