Log:
Évaluations - , GPA: ( )

Instructions Kobe Range Hoods, Modèle OIL CONTAINER RA3830SQ

Fabricant : Kobe Range Hoods
Taille : 1.46 mb
Nom Fichier : manaul-RA-038-SQ-EN-FR-SP-091210.pdf

Langue d'enseignement: enesfr

Le document est chargé, s'il vous plaît patienter
Le document est chargé, s'il vous plaît patienter

Facilité d'utilisation


3. Using references on Table 1 and measurement on page 16 center the hood in place beneath the cabinet and flush with the front of the cabinet. Refer to Figure 5. Figure 4 Figure 5 4. Draw electrical wires through cabinet access opening 5. Place screws (not provided) into the exact center of each hole. Make sure all screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING. Ductwork Installation 6. Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork above. Use duct tape to make all joints secure and air tight. Wiring to Power Supply 7. Connect the electrical wires. - If necessary to hide the electrical wire connections, push wires back into the hood. Access the wire connections underneath the hood by removing the bottom casing from the six screws. Before reattaching the bottom casing, make sure wires do not slip between motors, impellers, or any moving parts to prevent any damage. 6 SAFETY WARNING RISK OF ELECTRICAL SHOCK. THIS RANGE HOOD MUST BE PROPERLY GROUNDED. MAKE SURE THIS IS DONE BY A SPECIALIZED ELECTRICIAN IN ACCORDANCE WITH ALL APPLICABLE NATIONAL AND LOCAL ELECTRICAL CODES. BEFORE CONNECTING WIRES, SWITCH POWER OFF AT SERVICE PANEL AND LOCK SERVICE PANEL TO PREVENT POWER FROM BEING SWITCHED ON ACCIDENTALLY. -Connect three wires (black, white and green) to house wires and cap with wire connectors. -Connect according to color: black to black, white to white, and green to green. -Test the operation of the hood before moving on to next step. Make sure power is supplied to the hood. Install Accessories 8. Place the oil container (round) into keyhole under each safety screen. Turn clock-wise until firmly in place. Refer to Figure 6. 9. Slide oil container (oval) into plastic slot behind each safety screen. Refer to Figure 7. Figure 6 Figure 7 Final Assembly 10. Turn power ON in control panel. Check all lights and blower operation. 11. Make sure to leave this manual for the homeowner. 7 STAND ALONE INSTALLATION ***This installation only applied with the purchase of a duct cover. SAFETY WARNING HOOD MAY HAVE VERY SHARP EDGES; PLEASE WEAR PROTECTIVE GLOVES IF REMOVING ANY PARTS FOR INSTALLING, CLEANING OR SERVICING. NOTE: BE CAREFUL WHEN USING ELECTRICAL SCREWDRIVER, DAMAGE TO THE HOOD MAY OCCUR. Preparation before Installation NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING. -Decide the ductwork and locations. Refer to Figure 8. -Decide the location of the venting pipe from the hood to the outside. -A straight, short venting run will allow the hood to perform more efficiently. - Try to avoid as much transitions, elbows, and long run as possible. This may reduce the performance of the hood. -Use duct tape to seal the joints between pipe sections. - If necessary, prepare back wall frame with cross framing lumber for secure installation. Using references on Table 2 and measurement on page 16 decide the level of the lumber. Refer to Figure 9. Figure 8 Figure 9 Hood Preparation before Installation - Temporarily wire the hood to test for proper operation before installing. - Peel protective film off the hood and the duct cover (if any). -Attach the hood-mounting bracket behind the hood with (3/16x3/8 mm) screws (provided) as shown on Figure 10. Hood Installation CAUTION: If required to move the cooking range to install the hood, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE. 8 1. If necessary, attach two rubber stands (provided) with two (4x8 mm) screws (provided) to the back of the hood. 2. Using references on Table 2 and measurement on page 16, decide the leveling point of the hood. Position two mounting screws (not provided) on the wall, leaving 1/8” away from the wall as shown on Figure 11. 3. Align hood-mounting bracket to the two screws on the wall and hook hood into place. Tighten screws to secure hood to the wall. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING. Mounting Screws Hood- Mounting Bracket Figure 10 Figure 11 Duct Cover Installation 4. Mark the position of the duct cover-mounting bracket. Use calculation E from Table 2 for reference. Attach and secure duct cover-mounting bracket with two screws (not provided). Refer to Figure 12. NOTE: Inner duct cover will cover the duct cover- mounting bracket. 5. Connect electrical wires. Refer to “Wiring to Power Supply.” If necessary to hide the electrical wire connections, push wires back into the hood. Access the wire connections underneath the hood by removing the bottom casing from the six screws. Before reattaching the bottom casing, make sure wires do not slip between motors, impellers, or any moving parts to prevent any damage. 6. Use aluminum or steel pipe to connect the exhaust opening on the hood to the ductwork above. Use duct tape to make all joints secure and air tight. 7. Slide the inner duct cover up 2-inch before sliding the entire duct cover onto the hood....

Ce manuel est également adapté pour les modèles :
Radiateurs à gaz - OIL CONTAINER RA3830SQ (1.46 mb)
Radiateurs à gaz - OIL CONTAINER RA3836SQ (1.46 mb)
Radiateurs à gaz - OIL CONTAINER RA3836SQ (1.46 mb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories