|
Facilité d'utilisation
Electric units are NOT supplied with power cord. To connect power supply for electric units, models 6, 10: Open the operator panel. (Fig. 8) Insert power cord through cable inlet under left side of unit to desired length and secure the cable connection tight. (Fig. 9) The circuit diagram is located behind the control panel. To connect power supply for electric units, models 1020, 20, 40: Access power connection terminals by removing left side panel. Insert power supply cable through cable inlet under left side of unit to desired length and secure the cable connection tight. (Fig. 9) Connect supply wires as follows: Gray terminals: Blue terminal: Yellow/Green terminal: L1, L2, L3, phase sequence does not need to be observed Neutral (if applicable) Ground IMPORTANT In some areas Henny Penny Electric Combis are shipped set up for 240 volts, but can be converted to 208 volt operation. If conversion is necessary the unit must be reset and calibrated. Convert from 240 volt to 208 volt operation Disconnect unit from power supply source. Open service door (Fig. 8) by loosening fastener at top of the unit over the control panel using a 5 mm Allen wrench. A rubber grommet must first be removed to access the bolt. Move transformer primary lead from the 240v tap to the 208v tap (Fig. 10). Open left side panel and locate relay K3.1 (Fig. 11). Remove the jumper wire from the appropriate terminal positions. The terminals on K3.1 relay socket are numbered. Use the chart below to determine from which terminals to disconnect jumpers. Model Terminal Positions LCG-6 5 and 6 LCG-10 5 and 6 LCG-1020 5 and 6 LCG-20 6 and 7 LCG-40 5 and 6 Once conversion has been completed, a “total reset” of the CPU-PCB must be done. Record all end-user (custom) programs before undertaking a Total Reset. Secure all panels and covers. Total reset Turn on unit. Press and hold IQT Sensor key, IQT key, and PROG/START simultaneously and turn unit off. Release all keys. Wait at least 4 seconds and turn unit on. NOTE: With total reset procedure all custom programs are deleted. After a total reset, 12:00 or 13:00 will be indicated on the timer display. Real time must be reset. To set clock to actual time, see page 50. Humidity calibration The interior cabinet must be clean. If it is not, wipe clean. The interior cabinet temperature must be below 122°F (50°C) and the cabinet must be dry. Turn on unit. Open cabinet door. Select any cooking mode. Access diagnostic program by pressing TEMPERATURE key, IQT Sensor key, and IQT key simultaneously until the word “VERSION” appears next to the IQT key. Use Central Dial to select CALIBRATE. Close cabinet door. To start calibration press PROG/START and TEMPERATURE key simultaneously. Calibration starts automatically and lasts 45-60 minutes. After calibration, unit must be switched off for 5 seconds before using again. During calibration, several values will be shown on the display. Once calibration begins, do not interrupt the process. Do not open door until calibration is complete. After calibration, very hot steam–around 392°F (200°C)–remains in the cabinet. When opening the cabinet door hot steam will escape, and burns could result. INSTALLATION Fig. 12 Fig. 13 C B A Fig. 14 WA WA WZ Fig. 15 WZ1 WZ2 Water supply 9) Drain Connection (WA) For drain connection (Fig. 12) use only steam temperature resistant pipe, diameter 2 in. (50 mm) and constant slope 5%. No hose should be used. Direct drain connection is possible, ventilated gap is an integrated part of the appliance (Fig. 13). Drain pipe should be supported to the wall/floor. Max. water discharge rate during Auto Flush:11 gal./min. (0.7 liter/sec.) Average drain water temperature: 150°F (65°C). 10) Water Connection (WZ) Observe all local plumbing codes. Flush water line before connecting the water supply to the unit. Connect to cold, potable water only. Operational water pressure: MIN: 30 psi (200kPa...
Ce manuel est également adapté pour les modèles :Fours électriques - 6 (227.64 kb)
Fours électriques - 6 (227.64 kb)
Fours électriques - 6 (227.64 kb)