Log:
Évaluations - 2, GPA: 4.5 ( )

Instructions Roberts Gorden, Modèle DUAL AIR DAT75

Fabricant : Roberts Gorden
Taille : 1.47 mb
Nom Fichier :
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


If any of the original wire supplied with the heater must be replaced, it must be replaced with wiring material having a temperature rating of at least 105° C and 600 volts. SECTION 10: WIRING AND ELECTRICAL INFORMATION 10.5 DAT Wiring Diagram @%')D%1" 2#3#' E &#'/+2+2&/)'/)+&#% ! % ')D ;:/D&8F):!99'9)8')D')D ')8:')D/&8:B>C9 B%C! B#C" )):7" ! )'>4 98: "%% 9 /%'1%'')D@'@'%)1/')2%)1)) !')D%9 ')D0:: B C')/! ')D%G @+&02''''8! !''/')'%&')D @%&1)>!7 8@809 88)8%D :9%'1'%)1'9 ')D%)')D%/')D%/1' ) ' D ! ? . 7. $. 7 . . DUALAIR® HEATING AND COOLING UNITS INSTALLATION OPERATION AND SERVICE MANUAL 10.6 DAT Site Connections at Main Circuit Board " . 7. < . (. DI<. " . B' . . " . B . . " . B . . . < . . ". B . 8. :1. 7< . 29:9)9')'/&@0')/&+@02'''''@'&'+'0')'/ 9 $')D%9 % 8:<- ):!/D&8F; ')D !%G: ' ! $')D! >H ')D" ')D ;3 " ')D:9:H((D ! $D " " "! 7 0/&BJ C;D " " " SECTION 11: COMMISSIONING SECTION 11: COMMISSIONING Gas Fired Heater Installation, service, commissioning and annual inspection of the heater must be done by a contractor qualified in the installation and service of gas-fired heating equipment. Read this manual carefully before installation, commissioning, operation, or service of this equipment. All components are accessed via the hinged door. Opening the door exposes live electrical connections and hot components. Cooling Coils/Condensers Installation, service, commissioning and annual inspection of the cooling equipment must be done by a contractor qualified in the installation and service of refrigeration equipment. Read condenser manufacturer’s manual carefully before installation, commissioning, operation, or service of this equipment. . 4 -1+, . $ ". . 1. 11.1 Pre-Commission Checks All pre-commission checks must be carried out before lighting the heater. Ensure that the heater and all controls are suitable for the gas, pressure and electrical supply to which they are to be connected. 11.1.1 Louvres Where fitted, the air delivery louvres need to be set during commissioning to give the required air distribution. 11.1.2 Electrical Checks 1. Check that all site wiring is connected in accordance with the appropriate wiring diagrams on Page 17, Section 10.3 through Page 20, Section 10.6. 2. Check the correct fuse size is fitted; See Page 16, Section 10.1. 11.2 Gas Supply All aspects of the gas installation including the gas meter must be inspected, tested for soundness and purged in accordance with local and national codes. 11.3 Mechanical Checks 1. Check that the fan is free to run and that the fan rotates in the correct direction. To reverse rotation, transpose two of the incoming phase connections. 2. Check that the flue and air intake are installed in accordance with these instructions and local regulations. 3. Check that the settings of the Combination Fan/ Limit thermostat are correct - See Page 7, Section 4.3 and Page 8, Figure 4.4. NOTE: The second limit thermostat is preset and sealed at the factory and is not adjustable. 11.4 Begin Commissioning 11.4.1 Before Operating the Heater To ensure that all the controls are in safe working order, operate the heater for the first time with the isolating gas valve turned off. 1. Turn off the isolating gas valve 2. Using the installed external control, turn on the burner. The automatic sequence will now begin as described on Page 22, Figure 12. There will be no ignition of the burner and lockout will occur, proving the controls are operating correctly. . #+, . & " ! . !! . . ! ". DUALAIR® HEATING AND COOLING UNITS INSTALLATION OPERATION AND SERVICE MANUAL 22 Figure 12: Automatic Burner Control Box Sequence Figure 13: Modureg Gas Valve 9% =% " ) # *8&70*8&7& ($ * * > '*! *%#0> /*+ *33 < ./: ?? * /%%9# (% ( 2 % * " 2 / 0* "2% ? ?2% $ % "" ?? @* #$ ,*8&70@0 " A & " BC*8&7&@& " - =% '"$* If at any stage the flame fails, the control will go to "lockout". The red light will illuminate and the control must be manually reset before further start attempt. 4 4 > 4 <> D > 4 <> D <34 #K <4 #K +)#<4 < << % 8! > D < SECTION 11: COMMISSIONING 11.4.2 Commissioning the Gas Valves All DualAir® units are fitted with fully modulating burner operation. The Honeywell automatic gas valves are fitted with the Honeywell Modureg modulating regulator. See Page 22, Figure 13. The Modureg device provides the adjustments for maximum and minimum firing and is set using the two adjustments. See Page 22, Figure 13. The external control will operate the burner between these two limits depending on heat demand. The minimum set point must not be set lower than the minimum burner pressure stated on Page 6, Section 4...

Ce manuel est également adapté pour les modèles :
électrique - DUAL AIR DAT100 (1.47 mb)
électrique - DUAL AIR DAT115 (1.47 mb)
électrique - DUAL AIR DAT90 (1.47 mb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories