Log:
Évaluations - 1, GPA: 5 ( )

Instructions Bryant, Modèle 310AAV

Fabricant : Bryant
Taille : 1.24 mb
Nom Fichier : ii310a-45-3.pdf
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


Applications are easy with 4-way multipoise design, through-the-furnace downflow venting, 13 different venting options, and a door designed for easy service access. An inner blower door is provided for tighter sealing in sensitive applications. The 310AAV/JAV furnace is approved for use with natural or propane gas, and the 310JAV is also approved for use in Low NOx Air Quality Management Districts. STANDARD FEATURES • Noise elimination combustion system • Microprocessor based control center Adjustable heating air temperature rise LED diagnostics and self test feature • Patented blocked vent safeguard to ensure proper furnace venting • All models are Chimney Friendly when used with accessory vent kit • Four-position furnace: upflow, horizontal right, horizontal left, downflow Thirteen different vent options • Heat pump compatible • Hot surface ignition (HSI) • Residential installations eligible for consumer financing through the Comfort Credit Program • Twinning in Upflow, Downflow and Horizontal LIMITED WARRANTY • 20-year warranty on “Super S™” heat exchanger • 5-year parts warranty on all other components Catalog No: 5331-007 Form No. II 310A-45-3 12-02 Single-Stage Induced-Combustion 4-Wav Multipoise Furnace Cancels: II 310A-45-2/IM-PG8J-02 II 310A- Installation, Start-up, Operttiftgjfciihd Service and Maintenance Instructions Series 100/A NOTE: Read the entire instruction manual before starting the installation. This symbol ^ indicates a change since the last issue. TABLE OF CONTENTS SAFETY CONSIDERATIONS.....................................................2 INTRODUCTION..........................................................................4 CODES AND STANDARDS........................................................4 Safety.........................................................................................4 General Installation................................................................... 4 Combustion and Ventilation Air..............................................4 Duct Systems............................................................................5 Acoustical Lining and Fibrous Glass Duct..............................5 Gas Piping and Gas Pipe Pressure Testing.............................. 5 Electrical Connections..............................................................5 ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS PROCEDURE................................................................................5 LOCATION.................................................................................... 5 General......................................................................................5 Location Relative to Cooling Equipment................................6 AIR FOR COMBUSTION AND VENTILATION......................6 Unconfined Space.....................................................................7 Confined Space.........................................................................7 INSTALLATION...........................................................................8 Upflow Installation...................................................................8 Bottom Return Air Inlet...................................................... 8 Side Return Air Inlet...........................................................8 Leveling Legs (If Desired)..................................................8 Downflow Installation..............................................................8 Bottom Return Air Inlet......................................................9 Horizontal Installation..............................................................9 Suspended Unit Support...................................................... 9 Platform Unit Support......................................................... 9 Roll-Out Protection..............................................................9 Bottom Return Air Inlet...................................................... 9 Side Return Air Inlet...........................................................9 Filter Arrangement.................................................................... 9 Air Ducts................................................................................... 9 General Requirements.........................................................9 Ductwork Acoustical Treatment.......................................11 Supply Air Connections....................................................12 Return Air Connections.....................................................13 Gas Piping...............................................................................13 Electrical Connections............................................................15 115-V Wiring.....................................................................16 J-Box Relocation...............................................................16 Electrical Connection to J-Box....................................

Ce manuel est également adapté pour les modèles :
électrique - 310JAV (1.24 mb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories