|
Facilité d'utilisation
(page 9) Install the vent system and exterior termination. Step 4. (page 21) Field Wiring a. Millivolt Appliances – Install the operating control switch (not factory provided) and bring in electrical service line for forced air circulating blower (optional equipment). b. Electronic Appliances – Field wire and install operating control switch. Step 5. (page 21) Install blower kit (optional equipment). Step 6. (page 22) Make connection to gas supply. Step 7. (page 22) Install the logs, decorative volcanic stone and glowing embers. Step 8. (page 22) Checkout appliance operation. Step 9. (page 23) Install glass door frame assembly. Step 10. (page 23) Adjust burner to ensure proper flame appearance. Step 11. (page 23) Install the hoods. DETAILED INSTALLATION STEPS The appliance is shipped with all gas controls and components installed and pre-wired. Remove the shipping carton, exposing the front glass door. Remove the top panel. Remove the cardboard from underneath the pressure relief plates. Gently depress the outer top corners of the access panel until the catches "pop" the panel free, allowing it to swing out and down to open. Open the two latches (located under the firebox floor) securing the glass door. Remove the door by tilting it outward at the bottom and lifting it up. Set the door aside protecting it from inadvertent damage. See Figure 55on page 23. Step 1. FRAMING Frame these appliances as illustrated in Figure 9 on page 7,unless the appliance is to be installed in a corner. NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE. See Figure 10 on page 7 or Figure 11 on page 8 for corner framing installations. All framing details must allow for a minimum clearance to combustible framing members as shown in Table 2. If the appliance is to be elevated above floor level, a solid continuous platform must be constructed. Headers may be in direct contact with the appliance top spacers but must not be supported by them or notched to fit around them. All construction above the appliance must be self supporting. DO NOT use the appliance for structural support. The fireplace should be secured to the side framing members using the unit's nailing flanges - one top and bottom on each side of the fireplace front. See Figure 6.Use 8d nails or their equivalent. Side Framing Unit Nailing Flange(No clearance tocombustible framing is required) Left Side Front Corner of Fireplace Shown (Right Side Requirements the Same) Unit Being Secured By Its Nailing FlangesTo The Framing Note: The nailing flanges, combustible members and screw heads located in areas directly adjacent to the nailing flanges, are EXEMPT from the 1/2” clearance to combustible requirements for the firebox outer wrapper. Combustible framing may be in direct contact with the nailing flanges and may be located closer than 1/2” from screw heads and the firebox wrapper in areas adjacent to the nailing flanges. Frame the opening to the exact dimensions specified in the framing details of this manual. Figure 6 Step 2. ROUTING GAS LINE Route a ..." (13 mm) gas line along the inside of the right side framing as shown in Figure 7. Gas lines must be routed, constructed and made of materials that are in strict accordance with local codes and regulations. All appliances are factory-equipped with a flexible gas line connector and ... inch shutoff valve. (See step 6 on page 22). Right Side Front Corner of Fireplace Framing 6 ..." (152 mm) 3" (76 mm) Figure 7 EXTERIOR HORIZONTAL VENT TERMINATION CLEARANCE REQUIREMENTS V V V V V F C Fixed Closed Window Operable Window B B A B H M I D 3 ft. 3 ft. A A A = 9” in U.S. = 12” in Canada L B J X E V A G Inside Corner Detail *18” Ventilated Soffit Horizontal Termination Detail D Exterior Wall Center Line of Termination C 18” Inside Corner BC C * See Item D in the Text Below. EXTERIOR HORIZONTAL VENT TERMINATION CLEARANCE REQUIREMENTS V V V V V F C Fixed Closed Window Operable Window B B A B H M I D 3 ft. 3 ft. A A A = 9” in U.S. = 12” in Canada L B J X E V A G Inside Corner Detail *18” Ventilated Soffit Horizontal Termination Detail D Exterior Wall Center Line of Termination C 18” Inside Corner BC C * See Item D in the Text Below. X = Air Supply Inlet V = Vent Terminal = Area where Terminal is not Permitted Canadian Installation* US Installation** A = Clearance above grade, veranda, porch, deck, or balcony. 12 inches (30cm)* 12 inches (30cm)** B = Clearance to window or door that may be opened. 6 in (15cm) for appliances < 10,000 Btuh (3kW), 12 in (30cm) for appliances > 10,000 Btuh (3kW) and < 100,000 Btuh (30kW), 36 inches (91cm) for appliances > 100,000 Btuh (30kW)* 6 in (15cm) for appliances < 10,000 Btuh (3kW), 9 in (23cm) for appliances > 10,000 Btuh (3kW) and < 50,000 Btuh (15kW), 12 inches (30cm) for appliances > 50,000 Btuh (15kW)** C = Clearance to permanently closed window 12" (305mm) recommended to prevent window condensation 9" (229mm) recommended to prevent window condensation D = Vertical clearance to ventilated soffit located...
Ce manuel est également adapté pour les modèles :Cheminées - 500 (976.79 kb)
Cheminées - 800 (976.79 kb)