Log:
Évaluations - 4, GPA: 3.8 ( )

Instructions Grindmaster, Modèle 20

Fabricant : Grindmaster
Taille : 429.12 kb
Nom Fichier :
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


They should remain on your grinderbrewer in good, readable condition at all times. If one of your labels is missing or damaged, order a replacement label immediately. Part# 71104 Part # 61497 Located on outside back, grinderbrewer casing Located on front of grinderbrewer casing WARNING • USE ONLY ON A CIRCUIT THAT IS PROPERLY PROTECTED AND CAPABLE OF THE RATED LOAD. • ELECTRICALLY GROUND THE CHASSIS • DO NOT DEFORM PLUG OR CORD • FOLLOW NATIONAL AND LOCAL ELECTRICAL CODES • WATER CONNECTIONS SHALL COMPLY WITH THE PLUMBING CODE OF BOCA & THE FOOD SERVICE SANITATION MANUAL OF THE FDA • DO NOT USE NEAR COMBUSTIBLES • FAILURE TO COMPLY RISKS PERSONAL INJURY, DAMAGE TO EQUIPMENT, FIRE OR SHOCK HAZARD • READ THE ENTIRE OPERATING MANUAL INCLUDING THE LIMIT OF WARRANTY AND LIABILITY BEFORE BUYING OR USING THIS PRODUCT • ALWAYS UNPLUG UNIT FROM POWER SUPPLY BEFORE SERVICING OPGELET! HETE VLOEISTOFFEN EN OPPERVLAKKEN Technical Data - Export Models MODEL 10HE 11HE 20HE 21HE PART # 70929 70913 70931 70915 VOLTAGE 230 230 230 230 FREQUENCY 50/60 Hz 50/60 Hz 50/60 Hz 50/60 Hz WATTS 3270 3360 3270 3360 CIRCUIT BREAKER 20 20 20 20 NO. OF HOPPERS 1 1 2 2 HOPPER CAPACITY/HOPPER 2,5 kg 2,5 kg 3 kg 3 kg BREW CAPACITY 1,9 L 1,9 L 1,9 L 1,9 L NO. OF WARMERS 1 1 FEATURES : GRIND’N BREW x x x x GRIND ONLY x x x x BREW ONLY x x x x HALF BREW x x x x PAINTED CASING STAINLESS CASING x x x x OUTLET FOR WARMERS DIMENSIONS : WIDTH (cm) 23,5 23,5 23,8 23,8 DEPTH (cm) 61,6 61,6 61,6 61,6 HEIGHT (cm) *78,8 66,7 *95,25 83,2 WEIGHT (kg) 29 kg 29 kg 36 kg 36 kg SHIPPING WEIGHT (kg) 36,3 36,3 43,1 43,1 English * BASED ON 5" LEG HEIGHT ** INCLUDING WATER INLET FITTING Grind ’n Brew Coffee Systems Page 2 Grind ‘n Brew Installation, Start-up, and Brewing Instructions: (Read Completely!) Important: This brewer should be installed by a knowledgeable and experienced commercial equipment installer. Brewer Contents Your brewer package should include the following: 1-Grinderbrewer (either single or dual bean) 1-Operation and Instruction Manual (this manual) 1-Hose to 1/4" flare fitting (part # 61237) Tools Required for Installation #2 Phillips screwdriver 9/16" Wrench 5/8" Wrench (Or Crescent Wrench) 6" Level Note: Other tools may be needed depending on the type of water supply tubing and location. Unit Installation 1. Inspect unit to see if any damage occurred in shipment. 2. Position brewer on counter. Place on sturdy permanent counter top. (If you have an airpot brewer, Install 4" plastic legs (included) to the bottom of brewer. Lean brewer towards side to expose screw- holes underneath for legs. Adjust leg heights to suit the size airpots you will use.) Important: Adjust feet to level brewer. With bubble level, check to see that the brewer is level on countertop. English Water Hook-up (All Models): Important: This equipment must be installed in compliance with applicable Federal, State, and/or Local plumbing codes having jurisdiction. 1. The incoming water supply should have a shut-off valve connected in-line. The end should have a female 1/4" flare fitting. Water supply should be a 1/4" I.D. dedicated line branched off a 1" or larger supply line. 2. Prior to installing the brewer, flush out the water line by running approximately 1 gallon of water into a pail. This will insure no sediment from a new installation can get in the brewer. 3. Make sure your source water is turned off. Connect the source water line’s 1/4" female flare fitting (1) to the 1/4" male fitting on the hose connector (2). 4. Make sure Grind’n Brew is unplugged. Connect source water line to brewer with hose connector. 5. Turn source water valve on, sending water to the brewer. If there are any leaks, tighten connections to stop leakage. Figure A Page 3 Grind ’n Brew Coffee Systems Electrical Hook-up and Start-Up Procedure (All Models) (Do not plug in unit yet!) Important: This equipment must be installed in compliance with applicable Federal, State, and/or Local electrical codes having jurisdiction. Do not use extension cords. Make sure that outlet brewer plugs into is grounded. Important: Make sure “Main Power Switch” in back of unit is in “off” position before plugging in brewer. Important: Domestic Q models at 208/230V must have a 4 wire electrical connection. Circuit must have 2 hots, 1 ground, and 1 neutral wire. Failure to install with 4 wire connecion will void manufactures’ warranty. Grind’n Brews that are 208/230 volt require a 20 amp circuit. Export “E” models must have a 3 wire electrical connection. Circuit must have 2 hots, and 1 ground (no neutral). 1. Plug in brewer to electrical outlet. (Or run power to unit for hardwire applications) 2. Make sure brewbasket is inserted in brewrails. 3. Reach to the back of the brewer and press the white “main power switch” to the “on” position. The front control lights will go on and you will hear water entering the brewer. The tank will fill in 2-3 minutes from the moment you pressed the “main power switch” to “on”. 4. Now that...

Ce manuel est également adapté pour les modèles :
Cafetières - 10 (429.12 kb)
Cafetières - 21 (429.12 kb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories