|
Facilité d'utilisation
– Enhanced cable management in the lateral rack area. I For PRIMECENTER Racks and DataCenter Racks: The mounting of the rails in the different racks is described in the next sections. Installation of the cable management is described in detail in the Technical Manual for the respective rack. I For 19-inch standard rack (for the Japanese market): For information on mounting of the rails in the 19-inch standard rack (for the Japanese market) please refer to the "Rack mount guide". For rack systems from other manufacturers: BX900 S1 Operating Manual Installing the hardware 3rd-party rack The following requirements must be met: – Installation dimensions (see the dimensions shown in figure 2 on page 43). – The design of the rack support uprights must allow the rails to be screwed on at the front. – Rails that are screwed on at the front. The length of the rails can be adjusted to allow different rack depths. – No cable management support (delivered with the mounting kit). – Climatic conditions. For ventilation of the installed server system, there must be an unrestricted air inlet on the front of the rack and an air outlet in the backplane of the rack. In principle, the ventilation concept provides for the necessary cooling via the horizontal self-ventilation of the installed devices (air stream from front to back). – Power supply: For installation in 3rd party racks, you must ensure that the appropriate socket strips are present. 42 Operating Manual BX900 S1 Installing the hardware Figure 2: Mechanical requirements 1 Rack front 2 Rack back A Rack depth (comparison PRIMECENTER Rack 940/1000 mm) B Rack width (comparison PRIMECENTER rack 700 mm) BX900 S1 Operating Manual Installing the hardware Clearance for 19" installation plane C1 Front 19-inch installation plane C2 Rear 19-inch installation plane D Space for cabling (cable space depth) and ventilation E Space for control panel and ventilation F Space for right and left support systems P PRIMERGY installation depth a1 Front left support upright a2 Front right support upright b1 Rear left support upright b2 Rear right support upright 4.3.1 Installation in PRIMECENTER/DataCenter rack For installation in a PRIMECENTER/DataCenter rack, the following parts are required: – Two 3-HU Support brackets (for the EMEA market) – Two carrier rails (mounted) – Two holding-down clamps I – The descriptions and figures in this section refer to the current support system. For other support systems you will find the appropriate description in the packaging of the rack mounting kit. For information on mounting of the rails in the 19-inch standard rack (for the Japanese market) please refer to the "Rack mount guide". – General information regarding server installation in the rack is included in the technical manual for the appropriate rack. – For information on mounting of the server in the 19-inch standard rack (for the Japanese market) please refer to the "Rack mount guide". When mounting the left carrier rail in the PRIMECENTER/DataCenter rack, the supplied support brackets must first be mounted on the rear left support upright flush with the bottom edge of the device. E Read the installation guide in the technical manual for the corresponding rack. 44 Operating Manual BX900 S1 Installing the hardware E Mark the position of the bottom edge of the system unit on the support uprights. Figure 3: Attaching the support brackets ........ E Position the support brackets at the relevant height on the rear left support upright (place knob in the corresponding hole) and secure them using four centering screws (1). E Fasten the holding-down clamp at the upper end of the support bracket using two centering screws (2). E Fasten the second holding-down clamp at the same height as the first one to the rear left support upright using two centering screws. BX900 S1 Operating Manual Installing the hardware Figure 4: Attaching the left carrier rail ...... E Position the carrier rail in the support bracket (insert knob) - see (1). I For the Japanese market: There is no support bracket. Please position the support system directly on the support upright. E Fasten the carrier rail at the lower end of the support bracket using three centering screws (2). E Position the carrier rail in the front left support upright. E Fasten the carrier rail to the front support upright (3) using three M5 screws including plugwashers. E Repeat the operation for the right carrier rail. This rail does not require a support bracket. 46 Operating Manual BX900 S1 Installing the hardware Figure 5: Position of the cage nuts 1 5 10 15 20 25 E Fit the cage nuts for securing the server in the corresponding catches on the right and left support uprights. BX900 S1 Operating Manual Installing the hardware 4.3.2 Installing/removing the system unit V CAUTION! . Because the PRIMERGY BX900 S1 system unit is large and heavy, at least three people are needed to safely mount it in the rack or remove it from the rack. . Please observe the s...
Ce manuel est également adapté pour les modèles :Ordinateurs - BX900 S1 (4.89 mb)