Log:
Évaluations - 0, GPA: 0 ( )

Instructions HP, Modèle HP ProLiant DL170e G6 Server

Fabricant : HP
Taille : 690.34 kb
Nom Fichier :
Langue d'enseignement: iten
Aller à la télécharger



Par ce dispositif a également d'autres instructions :

Facilité d'utilisation





5. Verify the server BIOS version against the latest BIOS version
listed for this server.
Opening the server
6. If you do not have the latest BIOS, update the BIOS now. Refer
to the HP ProLiant DL170e G6 Server Maintenance and Service

NOTE: The product figures below are for reference only
Guide.
and do not reflect the actual configuration. Your server
7. Instal a supported operating system of your choice. For
may look different.
detailed procedures, refer to the documentation provided by

the operating system vendor.
The top cover is removable. Please fol ow the steps below to remove
the top cover:
Pre- and post-installation
1. Turn the lock counterclockwise to the location of unlocking
procedures
symbol. (Step 1 in Figure 12)
2. Pull up the latch in the open up position. (Step 2 in Figure 12)
When instal ing additional options in your HP ProLiant DL170e G6
3. Slide the top cover toward the rear of the unit and then lift the top
Server, observe the fol owing procedures:
cover to remove it away from the chassis. (Step 3 in Figure 12)
Pre-installation procedures
Figure 12 Removing the Top Cover
Pre-instal ation procedures for items (processors, DIMMs, ect.) on the
system board:
1. Press the node power but on on the front panel to turn off the
node.
2. Unplug the node from the chassis and place it on a flat surface.
3. Remove the PCIe cage and air baffle.
Pre-instal ation procedures for items (fans, HDD backplanes, etc.) in
the chassis:
1. Turn off the server and al the peripherals connected to it.
2. Disconnect the AC power cord from the power supply cable
socket located on the server rear panel to reduce the risk of
electrical shock.
3. If the server is instal ed in a rack, remove the server and place

it on a flat surface.
4. Remove the top cover by following the procedure described
Installing a hard drive
later in the “Opening the server” section.
Post-installation procedures
The server supports both SAS and SATA hard drives, and the
following installation figure uses the LFF hot-plug hard drive as
example.
Post-instal ation procedures for items (processors, DIMMs, ect.) on the
system board:
CAUTION: Drives can be damaged by static electricity.
1. Instal the PCIe cage and air baffle.
Before handling drives, touch an unpainted metal surface
to discharge static electricity.
2. Install the node to the chassis.

3. Connect all external cables and the AC power cord to the
To install a hard drive in the chassis:
node.
1. Remove the hard drive blank from the front of system if instal ed.
4. Press the node power button on the front panel to turn on the
node.
2. Push the hard drive assembly into the drive bay until it stops.
(Step 1 in Figure 13)
Post-instal ation procedures for items (fans, HDD backplanes, ect.) in
the chassis:
3. Press the hard drive carrier latch inward until it clicks. (Step 2
in Figure 13)
1. Be sure al components are instal ed according to the described
step-by-step instructions.
2. Check to make sure you have not left loose tools or parts inside
the server.
3. Reinstal the PCI cage, air baffle, peripherals, and system
cables that you have removed.
4. Reinstall the top cover.
5. Reinstal the server into the rack.
6. Connect all external cables and the AC power cord to the
system.
7. Press the power but on on the front panel to turn on the server.


...


Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories