|
Facilité d'utilisation
Procedures of Installation and Precautions Procedures to fix the hanger. 1. Drill holes on wall. 2. Push plug into the holes. 3. Fix the hanger on wall (As shown below) (As shown below) with 4.1 x 32 screw (As shown in figure below) Procedures to fix the holder of remote control. 1. Drill holes on wall. 2. Push plug into the holes. (As shown below) (As shown below) 2 Installation of the Indoor Unit VERTICALLY DOWNWARD PIPING Preparation Connect connecting cord. Pull out the pipe, connecting cord and drain hose. Installation The upper part of the Indoor unit is hanged on the hanger. The projection at the lower part of the Indoor unit is hooked onto the hanger. Please pull the lower part of the Indoor unit outwards to check if the unit is hooked onto the hanger. Improper installation may cause vibration and noise. ! CAUTION HORIZONTAL PIPING Preparation Change of Drain Hose and Installation Procedures. Exchange the location of drain hose and drain cap during horizontal piping as shown in figure below. Be sure to plug in the drain hose until the insulating material folds upon itself. Please use pliers to pull out the drain cap. (This is an easier way to remove the drain cap). INSTALLATION OF REFRIGERATING PIPES AFTER CONNECTION The refrigerating pipes should be adjusted to fit into the hole on the wall and then ready for further connection. The terminals of 2 connected pipes must be covered with insulator used for terminal connection. Then the pipes are wrapped with insulation pipe. Connect the connecting cord after removing electrical cover. (Refer to “CONNECTION OF POWER CORD”) After adjustment, fit the connecting cord and pipes into the space available under the indoor unit. Use holder to hold them tight. ! CAUTION The rubber strap used for fixing the insulator should not be tied with great force. Otherwise, this will damage heat insulation and causes water condensation. Holder can be attached at the either of 2 places. Please select the easier position. THE CONNECTION OF REFRIGERATING PIPE DURING THE INSTALLATION OF INDOOR UNIT Preparation To Install Refrigerating Pipes ! CAUTION Please fix in the plastic core after flaring to avoid plastic chips entering the pipes. CAUTION ! You are free to choose the side (left or right) for the installation of drain hose. Please ensure the smooth flow of condensed water of the Indoor unit during installation. (Carelessness may result in water leakage.) ! CAUTION Be sure that the drain hose is not loosely connected or bend. Be sure that the wire is not in contact with any metal in the wall. Please use the protection pipe as wire passing through the hollow part of the wall so as to prevent the possibility of damaged by mouse. Unless it seals completely, any air with high humidity flows from outdoor and any dew may drop. ! WARNING The refrigerating pipes and connecting cord transform and are attached. The end of the refrigerating pipes are at locations marked with “ ” symbol. 3 Installation of Drain Hose Installation Hang the Indoor unit onto the hanger. Use the temporary stand at the back of the Indoor unit to push its lower part 15cm forwards. Place the drain hose through the hole on the wall. Wrap the refrigerating pipes with insulation pipe after connecting refrigerating pipe. Connect the connecting cord after removing electrical cover. (Refer to “Connection of Power Cord”) After adjustment, the connecting cord and refrigerating pipes are placed into the space available under the Indoor unit. The projection of Indoor unit must hook to the hanger. INDOOR UNIT
Climatiseurs - RAC-14KH2 (933.4 kb)