Log:
Évaluations - 1, GPA: 5 ( )

Instructions Bard, Modèle P1148A1

Fabricant : Bard
Taille : 499.76 kb
Nom Fichier :
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


IMPORTANT: While this electrical data is presented as a guide, it is important to electrically connect properly size fuses and conductor wires in accordance with the National Electrical Code and all existing local codes. Manual 2100-324 Page 3 GENERAL INSTRUCTIONS IMPORTANT The equipment covered in this manual is to be installed by trained, experienced service and installation technicians. All duct work, supply and return ducts, must be properly sized for the design air flow requirement of the equipment. ACCA is an excellent guide to proper sizing. All duct work or portions thereof not in the conditioned space should be properly insulated in order to both conserve energy and prevent condensation or moisture damage. SHIPPING DAMAGE Upon receipt of equipment, the carton should be checked for external signs of shipping damage. If damage is found, the receiving party must contact the last carrier immediately, preferably in writing, requesting inspection by the carrier’s agent. GENERAL The refrigerant system is completely assembled and charged. All internal wiring is complete. The unit is designed for use with or without duct work. Flanges are provided for attaching the supply and return ducts. These instructions explain the recommended method to install the air cooled self-contained unit and the electrical wiring connections to the unit. These instructions and any instructions packaged with any separate equipment required to make up the entire heat pump system should be carefully read before beginning the installation. Note particularly “Starting Procedure” and any tags and/or labels attached to the equipment. While these instructions are intended as a general recommended guide, they do not supersede any national and/or local codes in any way. Authorities having jurisdiction should be consulted before the installation is made. FIELD INSTALLED HEATER PACKAGES (OPTIONAL) These packaged heat pumps are manufactured without supplementary electric heaters. Supplementary heaters EH5PB series (to fit P1142A3, P1148A1, and P1160A1) are available for simple, fast, field installation. A separate field power circuit is required for the supplementary heaters. IMPORTANT: Refer to Table 4 and 5 when designing duct work for maximum available static pressure with heater installed. Refer to the electrical data shown on pages 2 and 3 for proper application information on all available heater combinations and what units they can be used with. It also shows the applicable circuit ampacities, fuse size, and wire size for each heater combination. Refer to the installation instructions packed with the heater for details on how to insert it into the basic unit. TABLE 4 MAXIMUM ESP OF OPERATION P1142A3 P1148A1 P1060A1 A00 .50 .50 .50 A05 .50 .50 .50 A10 .50 .50 .50 A15 .40 .50 .50 A20 .40 .50 .50 B00 --. 50 .50 B09 --. 50 .50 B15 --. 50 .50 B18 --. 50 .50 C00 --. 50 .50 C09 --. 50 .50 C15 --. 50 .50 C18 --. 50 .50 Manual 2100-324 Page 4 Manual 2100-324 Page 5 FIGURE 1 PREFABRICATED ROOF CURB SPECIFICATIONS HEAVY GAUGE GALVANIZED WITH WOOD NAILING STRIP, WELDED/LEAKPROOF ONE PIECE CONSTRUCTION – READY TO INSTALL MIS-1177 FIGURE 2 FIELD FABRICATED CURBING MIS-1178 CURB AND ROOF DETAILS *Duct Sizing Information Return Air Dimension “C” is length Supply Air Dimension “C” is length Return Air Dimension “H” is width Supply Sir Dimension “J” is width Roof Curb A B C* D E F J* H* Roof Hood Model Air Conditioning Units 9042-004 82-3/8 44-1/8 41-1/8 38-3/8 35-3/8 44 14-3/4 19-1/8 RHE60 P1142A3, P1148A1, P1060A1 Roof Hood Model Unit Model E RHE60 P1142A3 P1148A1 P1060A1 44-7/8 INSTALLATION LOCATION GENERAL The unit must be located outside, or in a well ventilated area. It must not be in the space being heated or cooled. A sound absorbing material should be considered if the unit is to be installed in such a position or location that might cause transmission of sound or vibration to the living area or adjacent buildings. SLAB MOUNTING In areas where winter temperatures DO NOT go below 32° F for periods over twelve hours, the unit may be slab mounted at grade level. When installing unit at grade level, install on a concrete slab at least four inches above finished grade level. Slab should have a slope tolerance away from the building structure of at lease 1/4 inch per foot, while being level from side to side. Place slab in a location where runoff water from higher ground will not collect around unit. See Figure 3. A minimum of 18 inches should be provided between the coil inlet and any building surfaces. Provide at least four feet between coil outlet and any building wall, fences or other vertical structures. Provide a minimum of three feet clearance on the service access side of the unit. See Figure 4 ROOF MOUNTING When a unit is installed in areas where low ambient temperatures or strong winter winds exist, it should be placed for prevailing winter winds are not in direct line with the outdoor coil. If this is not possible, a wind barrier should ...

Ce manuel est également adapté pour les modèles :
Climatiseurs - P1060A1 (499.76 kb)
Climatiseurs - P1142A3 (499.76 kb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories