|
Facilité d'utilisation
pipe or 1/2 inch copper sweat connections. If the Moen Slip Fit spout is used, a 1/2 inch copper drop and lookout may be used. Measurements These are shown in the drawings. The depth measurement is critical. Use the front face of the plaster ground as a reference point for the finished wall position, including tile ( 1-3/4"[44mm] ). The supply piping centerline should be a maxium of 2" (51mm) and a minimum of 1" (25mm) behind the wall surface. Use thick wall handle extension kit 96945 for wall thickness 13/16" to 1-13/16". Use handle kit 96955 for wall thickness 1-13/16" to 2-13/16". WALL LINE FACE OF STUD 1-3/4" (44mm) 2-5/16" (59mm) MAX (IPS) 2-3/16" (56mm) MAX (CC) ESCUTCHEON SHOWER 45" (1143mm) to 48" (1219mm) 32" (813mm) FOR TUB/SHOWER COMBINATIONS AND TUB MODELS ONLY PLASTER GROUND KEY STOP TEMPERATURE LIMIT STOP KNOB HANDLE KNOB SCREW CAP SCREW HANDLE SCREW HANDLE ADAPTER HANDLE SCREW KNOB CAP PLUG BUTTON LEVER HANDLE FINISHED WALL SURFACE STOP TUBE WASHER 6'6" (1981mm) FLOOR TUB SPOUT IMPORTANT:SEEFLUSHINGINSTRUC- TIONSPAGE2ABC HANDLE ASSEMBLIES Always turn water off before disassembling the valve. Open valve handle to relieve water RETAINER pressure and to insure that complete water shut-off has been accomplished. CLIP CAUTION: Before turning water on during either rough-in or trim-out, make sure that cartridge retainer clip is in place. The cartridge and retainer clip were properly installed and tested before leaving the factory. Although it is unlikely, it is never- theless possible that through the handling of the valve by any number of persons the retainer clip may not be properly installed. This should be carefully checked at time of rough-in and trim-out. If the retainer clip is not properly installed, water pressure could force the cartridge out of the casting. Personal injury or water damage to the premises could result. Visit Moen's Web Site at WITH STOPS WITHOUT STOPS Stop Operation CC -This type is integral with casting, actuated by screwdriver, and require a 90° turn to open or close. When the screwdriver slot is vertical, the rubber stop is closed, and when the slot is horizontal, the rubber stop is open. IPS -This type has been added to the basic shower casting and is actuated by a screwdriv- er. The stop is opened by rotating in a counterclockwise direction until it stops and closed by rotating in a clockwise direction until it bottoms. Rough-In MAKE SURE ALL WATER SUPPLIES ARE OFF. SUPPLY Note the word "TOP" on the casting. Install casting with the TOP facing UP. If the valve is to be used for a shower only, plug the bottom outlet. If the valve is to be used for both a shower and a tub, connect the top outlet to the shower and the bottom outlet to the tub. Secure all pipes and the shower and tub drop ells. Use thread seal tape on all threads. Flushing IMPORTANT: Before closing all wall openings, pressure test valve and complete sys- tem using flushing instructions Pipe chips, sand and other solids found in ne...
Ce manuel est également adapté pour les modèles :équipement pour bateaux - 12242 (234.14 kb)
équipement pour bateaux - TL183 (234.14 kb)
équipement pour bateaux - 12341 (234.14 kb)
équipement pour bateaux - 12342 (234.14 kb)