Log:
Évaluations - 3, GPA: 3.7 ( )

Instructions GE, Modèle JDP39

Fabricant : GE
Taille : 331.08 kb
Nom Fichier :
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


flat area Wall stud Countertop thickness Bottom of countertop Wire cover Maintop Anti-tip bracket Bottom of countertop to engage bracket by 1/2” min. Wall stud 10-3/8” 1-1/2” Countertop surface Interior wall Wire cover Attachment anchored to wall stud is required Anti-tip bracket Attachment Non-kit application Maintop Position #5 non-kit application *Attachment to engage bracket by 1/2” min. 9 Installation Instructions INSTALL THE RANGE (CONT.) Carefully mark the cabinet for the location of the stop screws. Drill 1/8” pilot holes into the cabinet, each side of the range. (Make sure not to drill entirely through the cabinet wall.) Carefully turn the shoulder screws into the pilot holes until they are tight. INSTALL STOP SCREW These screws prevent the range from sliding out of position during operation. 2 PLACING THE RANGE INTO THE OPENING It is suggested that two people lift the range into place, carefully setting the side metal flanges on the edges of the countertop opening. Carefully slide the range toward the back of the opening. In the last 1” of travel, lift the front of the range approx. 1/2” to clear the stop screws located in the sides of the cabinet and slide the range until the range is seated. Lower front of the range onto countertop. 3 Countertop Make sure the edge of the countertop fits flush against the end of the Front Control Panel Countertop Cabinet Range Lift and slide range on countertop 10 ATTACH THE LOWER TRIM Attach the lower trim (supplied separately with the range) to the bottom of the vertical side trim with the 2 screws supplied. 5CHECK FOR PROPER INSTALLATION OF THE STOP SCREW Look at both sides of the range under the door. The stop screws must be located in the notch on the sides of the range, and not touch the top of the notch when the range is fully seated on the countertop. If the screws do not meet the requirements, move the screws to a position that meets these requirements. (See illustration below.) 4 Clear Side trim Shoulder screw Notch in bottom of side trim Top flange 1/2” wide Lower left corner front frame Attach 1 screw each side Side trim Lower trim End flange & tab on lower trim fits inside side trim Clear Side trim Shoulder screw Notch in bottom of side trim Top flange 1/2” wide Lower left corner front frame Attach 1 screw each side Side trim Lower trim End flange & tab on lower trim fits inside side trim Installation Instructions INSTALL THE RANGE (CONT.) Lift the oven door by placing one hand on each side. The door is heavy, so you may need help. Do not lift the door by the handle. With the door at the same angle as the removal position (halfway between the closed and broil stop position, seat the notch of the hinge arm into the bottom edge of the hinge slot. The notch of the hinge arm must be fully seated into the bottom of the slot. 7 6 Push the hinge locks up against the front frame of the oven cavity, to the locked position. Close the oven door. 10 9 Bottom edge of slot Hinge arm Hinge notch Notch of hinge securely fitted into bottom of hinge slot Hinge in locked position REPLACING THE OVEN DOOR NOTE: The oven door is heavy. You may need help lifting the door high enough to slide it into the hinge slots. Do not lift the door by the handle. Open the oven door as far as it will open.8 CHECK FOR PROPER INSTALLATION OF ANTI-TIP BRACKET Lower the oven door and gently apply medium force at the handle end until movement of the range is detected. Continue pressing until the anti-tip bracket is engaged and movement stops. A small amount of movement is acceptable at the back of the range top, but it should be stable and not tip once the anti-tip bracket is engaged. 11 12 Installation Instructions FINAL CHECKLIST • Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced. • Be sure power is in service to the building. • Check to be sure that all packing materials and tape on metal panel (if applicable) under control knobs and drawer have been removed. 12 OPERATION CHECKLIST • Check to make sure the Clock display is energized. If a series of horizontal red lines appear in the display, disconnect power immediately. Recheck the range wiring connections. If change is made to connections, retest again. If no change is required, have building wiring checked for proper connections and voltage. It is recommended that the clock be changed if the red lines appear. • Push down and turn any one of the four surface knobs to “MED” setting to observe that the element glows within 15 seconds. Turn the knob off when glow is detected. If the glow is not detected within the time limit, recheck the range wiring connections. If change is required, retest again. If no change is required, have building wiring checked for proper connections and voltage. 13 13 Installation Instructions ALTERNATE CONSTRUCTION PREPARATION Wall Must be flat Must be flat Must be level Must be level 30” smooth cut 9/16” 9/16” 25” Refer to the Filler or Backguard Kit instructions for I...

Ce manuel est également adapté pour les modèles :
Instruments de musique - JDS28 (331.08 kb)
Instruments de musique - 131-10595-2 1-07 JR (331.08 kb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories