Fabricant : Marvel Industries
Taille : 10.33 kb
Nom Fichier : 8001243.pdf
|
Facilité d'utilisation
Remove the remaining backing paper and match slot in shim to hole in ice machine frame, as shown in Fig. 1. Press in place. Repeat for opposite side. E. Set top ice machine carefully and squarely on bottom ice machine. F. Remove front and side panels from both ice machines. G. Bolt two ice machines together with 1/4-20 x 5/8” long bolt, lockwasher, and nut provided in kit, one each side. H. Remove angle A (Fig. 1) and set aside. 3. Installation of Water Shield: 1. Remove the water pump, float valve-bracket assembly, and sump trough from top ice machine. 2. Locate the water shield above the electrical box of the lower ice machine, as shown in Illustration 2. It will be secured using the existing screw in the lower right-hand corner of the top ice machine, as shown in Illustration 2. 3. Reinstall the sump trough, float valve-bracket assembly, and water pump 4. Installation of Ice Chute: A. Remove ice chute from kit and set bottom mounting brackets over angle B (Fig. 1). B. Put angle A in slots of top mounting brackets and secure in place. C. Check for free movement of both water curtains. D. Proceed to ice machine service manual for electrical and water hook-up and start-up procedure. E. Reattach front and side panels. F. Add four sheet metal screws to side panels, two on each side of lower ice machine, where the lower and upper ice machines butt. Manitowoc Ice, Inc. 2110 South 26 Street, P.O. Box 1720, Manitowoc, WI 54221-1720 USA Telephone 920-682-0161, Fax - Sales: 920-683-7589, Service/Parts: 920-683-7585, Other: 920-683-7879 8001243 Web Site - Rev. 01/13/00...