Log:
Évaluations - 3, GPA: 4 ( )

Instructions Chief Manufacturing, Modèle Single Stud Wall Arm CTA-025

Fabricant : Chief Manufacturing
Taille : 162.24 kb
Nom Fichier : 4b440b16-2eb9-40ec-8002-bf057b426179.pdf
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


CHIEF MANUFACTURING INC. 8809-000027 (Rev. A) 1-800-582-6480 952-894-6280 FAX 952-894-6918 2004 Chief Manufacturing 8401 EAGLE CREEK PARKWAY, STE. 700 SAVAGE, MINNESOTA 55378 USA Installation Instructions CTA-025 CTA-025 – SPECIFICATIONS (L) Length Table 1. CTA-025 Specifications Max Model L-Length (fixed) Support Weight Wall Mount Description CTA-025* 25.0” 150 lbs (68.0 kg) Wood Stud Installation NOTES 1. *Metal stud mounting is not recommended. 2. For concrete or brick installations, use CMA-380. Installation Instructions CTA-025 IMPORTANT WARNINGS and CAUTIONS! WARNING A WARNING alerts you to the possibility of serious injury or death if you do not follow the instructions. CAUTION A CAUTION alerts you to the possibility of damage or destruction of equipment if you do not follow the corresponding instructions. WARNING Improper installation can result in serious personal injury! Make sure that the mounting surface can support a redundant weight factor five times the total weight of the equipment: if not, reinforce the mounting surface structural members before installing the mount. WARNING Be aware of the potential for personal injury or damage to the equipment if it is not adequately mounted. WARNING The installer is responsible for verifying that the mounting surface to which the CTA-025 is anchored will safely support the combined load of all attached components or other equipment. WARNING The combined weight of the TV/monitor and all attached components and equipment placed on a Chief Wall Arm must not exceed the maximum support weight specified in Table 1 (see page 2). WARNING Watch for pinch points. Do not put your fingers between movable parts. CAUTION Check the unit for shipping damage before you begin the installation. CONTENTS CTA-025 – SPECIFICATIONS........................................2 CONTENTS......................................................................3 INSPECT THE UNIT BEFORE INSTALLING..............3 PARTS ..............................................................................4 TOOLS REQUIRED FOR INSTALLATION..................5 INSTRUCTIONS..............................................................5 Installing Wall Arm.......................................................5 Attaching Front Cover...................................................6 Connecting NPT Pipe or Nipple to Wall Arm...............6 INSPECT THE UNIT BEFORE INSTALLING Unpack the carton. Carefully inspect the parts for shipping damage. Verify contents listed in Table 2. If you are missing any of the listed parts, contact Customer Service at: 1-800/582-6480.300. Table 2. Shipping Contents ITEM DESCRIPTION QTY 10 Wall Arm 1 20 Front Cover 1 30 5/16 X 2.5” Lag Bolt 2 40 5/16 Flat Washer 2 50 M4 X 8mm Phillips Head Cap Screw 4 60 M6 X 6mm Set Screw 1 70 M3 Allen Key 1 Installation Instructions CTA-025 PARTS 20 10 40 60 50 70 30 Figure 1. CTA-025 Parts Installation Instructions CTA-025 TOOLS REQUIRED FOR INSTALLATION The tools required for installation are as follows: • Electric drill and bit set • Stud sensor (mechanical or electronic) • .” box-end wrench or ratchet with .” socket • 13mm box-end wrench or ratchet with 13mm socket • Level NOTE: Other tools may be required depending on your method of installation. INSTRUCTIONS Step 1 Installing Wall Arm 1. Locate the wall arm (10), two lag bolts (30) and two flat washers (40). See Figure 2. WARNING It is the installer’s responsibility to verify that the structure to which the mount is anchored will safely support five times the combined load of all attached components and equipment. 2. Determine a suitable mounting location. Keep in mind that you will be mounting the wall arm (10) to a wood stud, on center. 3. Using a stud sensor, locate the wood stud where you will mount the wall arm (10). 4. Holding the wall arm (10) against the wall, use a pencil, awl, or small nail to mark the mounting holes where two pilot holes will be drilled into the center of the wood stud. Make sure that the mounting holes are centered. 5. Using a 15/64” drill bit, drill two pilot holes for anchoring the wall arm (10). 6. Using two 5/16” lag bolts (30) and two 5/16” flat washers (40), install the wall arm (10) on the wall. Wall Stud (30) (40) (10) Figure 2. Install Wall Arm Installation Instructions CTA-025 STEP 2 Attaching Front Cover 1. Locate front cover (20) and four M4 x 8mm Phillips head cap screws (50). NOTES • The front cover may be partially removed and reinstalled to conceal power/audio/video cables after the TV/Mount is installed. • You may remove one or both knockouts on cover to assist routing to wall through cover. 2. Install the front cover (20) using four M4 8mm Phillips head cap screws (50). See Figure 3. (20) (50) Figure 3. Attach Front Cover STEP 3 Connecting NPT Pipe or Nipple to Wall Arm 1. Locate M6 x 6mm set screw (60) and 1-1/2” NPT pipe or nipple (supplied with TV Mount or purchased separately). 2. Connect the 1-1/2” NPT pipe or nipple ...


Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories