Fabricant : Premier Mounts
Taille : 785.44 kb
Nom Fichier : e363b990-1e16-482d-9636-83640cdb8444.pdf
|
Facilité d'utilisation
THE INSTALLATION INSTRUCTIONS MUST BE READ TO PREVENT PERSONAL INJURY AND PROPERTY DAMAGE. KEEP THESE INSTALLATION INSTRUCTIONS IN AN EASILY ACCESSIBLE LOCATION FOR FUTURE REFERENCE. PREMIER MOUNTS DOES NOT WARRANT AGAINST DAMAGE CAUSED BY THE USE OF ANY PREMIER MOUNTS PRODUCT FOR PURPOSES OTHER THAN THOSE FOR WHICH IT WAS DESIGNED OR DAMAGE CAUSED BY UNAUTHORIZED ATTACHMENTS OR MODIFICATIONS, AND IS NOT RESPONSIBLE FOR ANY DAMAGES, CLAIMS, DEMANDS, SUITS, ACTIONS OR CAUSES OF ACTION OF WHATEVER KIND RESULTING FROM, ARISING OUT OF OR IN ANY MANNER RELATING TO ANY SUCH USE, ATTACHMENTS OR MODIFICATIONS. THE SURFACE MUST BE CAPABLE OF SUPPORTING AT LEAST FIVE TIMES THE WEIGHT OF THE BOX. IF NOT, THE CEILING STRUCTURE MUST BE REINFORCED. THE MAXIMUM WEIGHT THAT CAN BE USED WITH THIS PRODUCT IS 75LBS. PROPER INSTALLATION PROCEDURE BY A QUALIFIED SERVICE TECHNICIAN, AS OUTLINED IN THE INSTALLATION INSTRUCTIONS, MUST BE ADHERED TO. FAILURE TO DO SO COULD RESULT IN SERIOUS PERSONAL INJURY, OR EVEN DEATH. SAFETY MEASURES MUST BE PRACTICED AT ALL TIMES DURING THE ASSEMBLY OF THIS PRODUCT. USE PROPER SAFETY GEAR AND TOOLS FOR THE ASSEMBLY PROCEDURE TO PREVENT PERSONAL INJURY. At least two qualified people should perform the assembly procedure. Injury and/or damage can result from dropping or mishandling the product. This product is intended for indoor use only. Use of this product outdoors could lead to product failure and personal injury. Do not install near sources of high heat. Do not install on a structure that is prone to vibration, movement or chance of impact Contact Premier Mounts with any questions (800) 368-9700 techsupport@mounts.com Page 2 Installation Instructions Installation Instructions Page 3 Parts List This accessory is shipped with all proper installation hardware and components. Make sure that none of these parts are missing and/or damaged before beginning installation. If there are parts missing and/or damaged, please stop the installation and contact Premier Mounts (800-368-9700). Installation Tools Equipment Tray (Qty 1) M4 x 8mm Security Head Screw (Qty 10) M5 Security Wrench GB-PIPE1 M3 Security Wrench M8 x 12mm Security Head Screw (Qty8) Upper Plate (Qty 1) Side Panel (Qty 2) M5 x 10mm Security Head Screw (Qty4) Page 4 Installation Instructions GB-PIPE1 Installation Step 1. Determine where the GB-PIPE1 will be located. Step 2. Install your 1-1/2” NPT or ceiling adapter. Step 3. Attach the upper plate to the NPT or adapter by rotating counter-clockwise. Step 4. Use an M3 security wrench to tighten the set screw. Upper Plate Step 5. At this time, run all existing cables through the pipe and down through the upper plate. The GB-PIPE1 is designed for use with either a standard piece of 1-1/2” NPT pipe or any available ceiling mount adapter from Premier Mounts. Please refer to the ceiling mount adapter installation instructions when mounting. GB-PIPE1 Unpack the Gear Box and review any WARNING statements that apply to the installation. Select the desired location for the GB-PIPE1. The upper plate must rotate onto the threads at least four (4) complete rotations. 1-1/2” NPT Set Screw M3 Security Wrench Pipe Cables At this time, you may pre-install your electronic components in the equipment tray. Electronic Component Installation Instructions Page 5 GB-PIPE1 Mounting Hole Spring Loaded Nuts Step 6. Lift the equipment tray into position. Upper Plate Step 7. Line up the mounting holes with the threaded shaft of the spring loaded nuts. Step 8. Once the holes are lined up, press down on the spring loaded nuts and tighten. Step 9. Insert and tighten two (2) M4 x 10mm security screws on the upper plate. Electronic Components 1-1/2” NPT Installation The NPT must rotate onto the equipment tray four (4) complete rotations. Step 2. Use an M3 security wrench to tighten the set screw. Step 3. Attach projector mount to NPT. 1-1/2” NPT 1-1/2” NPT Equipment Tray Set Screw Step 1. Place the threaded end of the 1-1/2” NPT into the plate hole. Plate Hole Before attaching the lower 1-1/2” NPT, it is strongly recommended that all connections in the equipment tray be made at this time. Once the connections are made, feed the cables through the plate hole and then through the 1-1/2” NPT. Please read instructions below to complete the installation. M4 x 10mm Security Screws Please follow the instructions included with the mount to complete this step. If using a PDS Series mount, connection may be made directly to the bottom of the equipment tray. Page 6 Installation Instructions GB-PIPE1 PDS-PLUS Installation without NPT (Optional) Before attaching the PDS-PLUS, it is strongly recommended that all connections in the equipment tray be made at this time. Once the connections are made, feed the cables through the plate hole and then through the 1-1/2” NPT. Please read instructions below to complete the installation. M5 Security Wrench M8 x 12mm Security Head Screw Equipment Tray Step 1. Remove the lower mounting plate from...
Ce manuel est également adapté pour les modèles :Projecteurs - GB-PIPE1B (785.44 kb)