|
Facilité d'utilisation
An adjustable wrench is required. Place pivot bracket in position on gear box as shown in figure 5. Secure with four hex screws (A) and lockwashers (B). See figure 5. FIGURE 5 6. Insert link clevis pins (G) through outside holes of pivot bracket assemblies. Using two adjustable wrenches, tighten link clevis pins in place with lockwashers 5/8" (B) and hex center lock nuts 5/8-18 (H). See figure 6. 7. Install cover bracket assembly to gear box (as shown in figure 7) using four hex screws 1/2-13 x 1-1/4" (C) and 1/2" lockwashers (D). An adjustable wrench is required. NOTE All hex screws should be hand tightened. When _a[l_ screws are in place, then tighten with adjustable wrench. FIGURE 7 Place tiller cover assembly in position on the tiller cover bracket as shown in figure 8. Using six 1" carriage bolts (Q), six 5/16" lockwashers (R) and six 5/16-18 hex nuts (S) start by hand. Do Not Tighten. a. Place two of the carriage bolts in the top center of the cover first. See figure 8. b. Place the next two carriage bolts in the rear of the cover as shown in figure 8. c. Place two more carriage bolts in the front of the cover as shown in figure 8. d. Do not tighten any of the six bolts in step 8 until step 9 is completed. 10. Using an adjustable wrench, tighten all ten carriage bolts used in steps 8 and 9. 11. Block up the front of the tiller so that the input shaft is clear of the ground. Place the universal drive shaft in position on input shaft of gear box and secure with spring pin (O). See figure 10. A hammer is required. HAMMER, WOODEN BLOCK . * GE- GEARBOX "... • INPUTSHAPT' A : % FIGURE 10 FIGURE 8 ATTACHING TILLER TO TRACTOR 1. Determine which linkage kit you have on your tractor. See figures 11 and 12. Using the four remaining carriage bolts (Q), lockwashers (R) and hex nuts (S), assemble tiller cover straps to cover bracket and cover. See figure 9. FIGURE 9 5 FIGURE 11 2. The front cross shaft must be removed in install tiller. Store in a safe place. It will be required when reinstalling deck. NOTE When removing tiller and reinstalling mower deck, be sure front cross shaft is reassembled as shown in figures 11 and 12. USE THESE HOLE FOR 50" LINKAG 3. Raise the lift lever on tractor. 4. Assemble the hanger brackets to drive shaft, using four hex screws (J), lockwashers (K) and hex nuts (L). See figures 13 and 14 to determine hole locations required. For 42" or 50" linkage kits. See figure 14A for hydrostatic tractors only. USE THESE HOLES FOR 42" LINKAGE HANGER! BRACKE“ HEXSCREWS /J) LOCKWASHERS (K) HEX NUTS (L) FIGURE 14 HANGER BRACKET SUPPORT BRACKET HEX SCF LOCKW>i HEX Nli lr#f / NOTE: HANGER BRACKET / MOUNTS TO INSIDE OF SUPPORT BRACKET. SS (K) 1 FIGURE 14A-Used on Hydrostatic Tractor Only. 5. Place end of drive shaft over P.T.O. shaft on front of tractor. See figure 15. FIGURE 13 6 FIGURE 15 6. Secure drive shaft and hanger brackets to linkage kit as shown in figure 16. Clevis pins (N) and hair pins (M) are assembled through the hanger brackets and both lift straps. 7. Place the tiller behind the tractor. Lower the lift lever on the tractor. 8. Remove the turn buckle from tractor. Remove ^ the chains and hook bolts from three point hitch. See figure 17. TURN BUCKLE UNIVERSAL DRIVE SHAFT FIGURE 19 UNIVERSAL DRIVf SIIAf I FIGURE 17 9. Slide the tiller forward so the universal drive shaft can be a...
Ce manuel est également adapté pour les modèles :Outils de jardin - 199-956A (1.98 mb)
Outils de jardin - 19956-9 (1.98 mb)
Outils de jardin - 19981-9 (1.98 mb)