Log:
Évaluations - 4, GPA: 4 ( )

Instructions American Standard, Modèle TOWNSQUARE 2555.602

Fabricant : American Standard
Taille : 227.87 kb
Nom Fichier : Install_1275.pdf
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering, flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread sealant or Teflon tape on threaded connections. NOTE Connect hot and cold water supplies. Cap off shower pipe (5) and tub filler pipe (6). For support, use pipe BRACES (7) secured to wooden braces. With valve turned off, turn on water supplies. Check for leaks. If the valve is installed on a fiberglass or other thin wall application, the PLASTER GUARD (4) can be used as a support. Cut a 4" dia. hole in the shower stall. Drill two additional 1" holes to allow access to the stops. Remove PLASTER GUARD (4), rotate 180° so that indicated screw holes fit MANIFOLD (2). Push CAP on valve, place ESCUTCHEON on and attach with screws. See Roughing-in diagram before starting. Connections are: 1/2" female NPT for threaded inlets Connect RISER PIPE (1) to MANIFOLD (2) top outlet marked "SHR". Connect TUB FILLER PIPE (3) at bottom outlet marked "TUB". For proper positioning the finished wall must be within side wall of PLASTER GUARD (4). COLD HOT 1 7 5 3 6 2 4 PRESSURE BALANCING BATH AND SHOWER-Built-in Diverter for TUB FILLER Required Tools Adjustable Wrench Channel Locks Flat Blade Screwdriver Plumbers' Putty or Caulking Phillips Screwdriver 1-5/8" TO 3-1/4" FINISHED WALL BOTTOM OF TUB 74" FOR HEAD CLEARANCE 2" REF. 1/2" I.P.S. 1 7-1/2" OPTIONAL TO FINISHED FLOOR USUALLY BETWEEN 65'' AND 78'' 8" REF. 7-1/4" REF. 4" 1/2" COPPER 1-3/4" REF. 18" OPTIONAL "SEE ILLUSTRATION" TOP OF TUB RIM SHW TUB M968789 Rev. 1.5 Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years. To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin. 3 INSTALL TRIM Push CAP (1) over VALVE CARTRIDGE (2). Mount ESCUTCHEON (3) and gasket to valve body with SCREWS (4). Remove PIPE CAPS (5) from shower pipe and tub filler pipe. Install SHOWER ARM (6) and SHOWER HEAD (7). Install SLIP-ON TUB SPOUT (8). Tighten with HEX WRENCH supplied. 2 INSTALL DIVERTER When finished tiling the wall, remove PLASTER GUARD (1). Remove two screws that secure the DIVERTER LID (2) and remove Lid. Inspect the inside surface of diverter port. Diverter port must be free of any dirt. Clean if necessary. Install DIVERTER (3) with SCREWS (4) removed from DIVERTER LID (2). Operate DIVERTER (3). DIVERTER (3) should slide in and out smoothly. Push on DIVERTER COVER (5). 1 2 4 5 3 DIVERTER PORT ADJUST HOT LIMIT STOP By restricting HANDLE rotation and limiting the amount of hot water allowed to mix with the cold, the HOT LIMIT SAFETY STOP (1) reduces risk of accidentalscalding. To set the maximum hot water temperature of your faucet, all you need to do is adjust the setting on the HOT LIMIT SAFETY STOP (1). 4 Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before making adjustment to HOT LIMIT STOP (1). ...

Ce manuel est également adapté pour les modèles :
Plomberie - TOWNSQUARE 2555.602 (227.87 kb)
Plomberie - TOWNSQUARE 2555.602 (227.87 kb)
Plomberie - TOWNSQUARE 2555.602 (227.87 kb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories