|
Facilité d'utilisation
EST IN CANADA 1-800-387-0369 (TORONTO 1-905-306-1093) Weekdays 8:00 a.m. to 7:00 p.m. EST Product names listed herein are trademarks of American Standard Inc. © American Standard Inc. 2003 Installation Instructions R510 R530 ROUGH VALVE KIT CENTRAL THERMOSTAT LESS VOLUME CONTROL Thank you for selecting American-Standard...the benchmarkof fine quality for over 100 years. To ensure that your installation proceeds smoothly--pleaseread these instructions carefully before you begin. TOP Certified to comply with ANSI A112.18.1M ASSE 1016 M968256A ROUGHING-IN DIMENSIONS 1/2" NPT OUTLETS FOR R510 1/2" NPT OUTLETS FOR R510 3/4" NPT OUTLETS FOR R530 3/4" NPT OUTLETS FOR R530 5-7/8" 48" TO 54" FOR SHOWER ONLY (OPTIONAL) 32" TO 42" FOR BATH/SHOWER AND BATH FILLER (OPTIONAL) 3-3/8" FINISHED FLOOR FINISHED WALL 1-11/16" to 2-1/2" CL THERMOSTATIC SHOWER THERMOSTATIC SHOWER INSTALLATION THERMOSTATIC SHOWER INSTALLATION INSTALLATION USING ONE USING TWO ON/OFF VALVES, FIXED USING THREE ON/OFF VALVES, FIXED ON/OFF VALVE AND FIXED SHOWER AND ADJUSTABLE HAND SHOWER, ADJUSTABLE HAND HELD SHOWER HELD SHOWER SHOWER AND TWO BODY SPRAYS (2) On/Off Volume Control Valves (3) On/Off Volume Control Valves On/Off Volume Control Valve 1/2" or 3/4" inlet HOT COLD 3/4" HOT COLD 1/2" or 3/4" inlet 1/2" or 3/4" inlet HOT COLD 1/2" or 3/4" inlet 1/2" or 3/4" inlet 1/2" or 3/4" inletTUB PORT MUST BE PLUGGED TUB PORT MUST BE PLUGGED TUB PORT MUST BE PLUGGED INLET AND OUTLET CONNECTIONS ARE 1/2" NPT FOR R510 INLET AND OUTLET CONNECTIONS ARE 3/4" NPT FOR R530 INLET AND OUTLET CONNECTIONS ARE 1/2" NPT FOR R510 INLET AND OUTLET CONNECTIONS ARE 1/2" NPT FOR R510 NOTE: TO OPERATE ALL FOUR OUTLETS AT THE SAME TIME THE MINIMUM REQUIREMENTS ARE: INLET AND OUTLET CONNECTIONS ARE INLET AND OUTLET CONNECTIONS ARE FLOWING PRESSURE OF 40 PSI WITH R510 3/4" NPT FOR R530 3/4" NPT FOR R530 FLOWING PRESSURE OF 20 PSI WITH R530 TOP TOP M968256A CHECK STOP (HOT RED) PLUG TUB PORT CHECK STOP (COLD BLUE) 3 TEMPERATURE CALIBRATION Unscrew PLASTER GUARD SCREWS and remove PLASTER GUARD. Check that arrow marking B points vertically upwards. If not, push the BLACK CLAMP on the SECURING RING to the right, pull off KNOB MOUNT and reinstall KNOB MOUNT with arrow "B" pointing upwards. For 100 F adjustment, turn the water supply on. Turn KNOB MOUNT until the spout temperature is 100 F. Check that arrow marking A on the KNOB MOUNT still points upward after adjusting the thermostat to 100 F. If not, pull out the RED LOCKING DEVICE. Remove KNOB MOUNT by pulling it towards you while standing directly in front of the valve. Reinstall the KNOB MOUNT so that the arrow marking A points upwards. The maximum mixed water temperature is set at 109 F at the factory. This setting can be changed if desired. Remove the TEMPERATURE LIMIT STOP (H shaped Black Plastic part). Reinstall it at the desired notch as indicated in the diagram to limit the maximum mixed water temperature to 104 F or 112 F. Reinstall RED LOCKING DEVICE. KNOB MOUNT ARROW "A" BLACK ARROW CLAMP "B" RED LOCKING DEVICE SECURING RING 104 109 112 TEMPERATURE LIMIT STOP Turn off hot and cold water CAUTION supplies before beginning. WARNING 1 Prepare water supplies per ROUGHING-IN DIMENSIONS. Make sure the finished wall is between the minimum 1-11/16" and maximum 2-1/2" rough dimension. ROUGHING-IN THE VALVE Install VALVE (1) at indicated height and depth. Make sure the "TOP" marking on the PLASTER GUARD (2) is up. For support, use pipe BRACES (3) secured to wooden braces. Connect the hot and cold water supplies. Assemble all connecting pipes. Close off the tub port if it is not needed using a commercially available pipe plug. Connections are 1/2" NPT or 3/4" NPT. IMPORTANT! INSTALL ANY REQUIRED SHUT OFF OR DIVERTER VALVE INTO THE PIPING SYSTEM. DO NOT SOLDER DIRECTLY TO THE VALVE BODY (1); THIS WILL DAMAGE THE TEMPERATURE CONTROL ELEMENT AND CHECK STOP VALVES. If the CHECK STOPS (4, 5) were removed during installation, ensure the hot and cold CHECK STOPS (4, 5) are not reversed. The hot CHECK STOP (4) has a red top and the cold CHECK STOP (5) has a blue top. CHECK STOPS (4,5) are supplied in the open position. Closing using 5/32" (4 mm) hex wrench to pressure test and to check for leaks. Reassemble PLASTER GUARD (2) and FINISH WALL. Beware of Freezing. No water should remain in the MIXING VALVE if freezing is a possibility. Remove the CHECK STOPS (4,5) to completely drain the MIXER UNIT (1). Remove PLASTER GUARD (2) if still installed. Turn on water supplies and check for leaks. To flush lines, remove the CHECK STOPS (4,5) and run water. If desired, the TEMPERATURE CONTROL UNIT can be removed. Reinstall CHECK STOPS (4,5) and CONTROL UNIT (6), if it was removed. COLD HOT COLD HOT 1 3 2 4 WOOD BRACE 5 6 Should the hot and cold water supply pipes have been transposed making adjustment impossible, proceed as follows: TRANSPOSED SUPPLY PIPING OR BACK TO BACK INSTALLATION 2 Remove check stops and re-install them transposed. Shut off w...
Ce manuel est également adapté pour les modèles :Thermostats - T050110 (368.47 kb)