Log:
Évaluations - 4, GPA: 4 ( )

Instructions Evo Fitness, Modèle TAHOE 51551

Fabricant : Evo Fitness
Taille : 7.84 mb
Nom Fichier : Tahoe-EVO_manual.pdf
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


Attach Top Cross Frame (7) to the Top Connect Beam (4) using two 1/2" x 4-1/4" Hex Head Bolts (73), four 1/2" x 1-1/16" Washers (89) and two 1/2" Nylon Nuts (94). ASSEMBLY assembly instructions -12- assembly instructions -13- Step 6: Cap the Pec Dec Lower Pulley Block (18) with 2" End Plug (54). Attach the Pec Dec Lower Pulley Block (18) to the Pec Dec Upright (6) using two 1/2" x 3" Hex Head Bolts (77), four 1/2" x 1-1/16" Washers (89) and two 1/2" Nylon Nuts (94). Attach the Back Pad (44) to the Pec Dec Upright (6) using two 3/8" x 2-3/4" Hex Head Bolts (83) and two 3/8" x 7/8" Washers (90). Cap the Leg Presses (20) with 2" x 3 Rect End Plugs (55). Attach Leg Presses (20) to Rear Base (1) each using two 1/2" x 3" Hex Head Bolts (77), four 1/2" x 1-1/16" Washers (89) and two 1/2" Nylon Nuts (94). ASSEMBLY Step 7: Hook the Lift Bar (11) onto the Racks (5). NOTE: The Hinge Plate (29) MUST face front. Insert the Guide Rod (9) through the sleeve on Lift Bar (11), 2" Rubber Doughnut (63), Right Adj Height Arm (13) and into the sleeve on Side Base (2). Then secure with 5/16" x 3/8" Set Screw (85). Hook Left Adj Height Arm (14) onto Rack (5). Repeat the same procedure for left side of Lift Bar (11) and Left Adj Height Arm (14). Slide 3" Rubber Doughnut (61) and Long Olympic Sleeve (36) onto each end of Lift Bar (11). Secure Long Olympic Sleeve (36) with 5/16" x 1/2" Set Screw (86). Attach 2" Spring Clip (57) to Long Olympic Sleeve (36). ASSEMBLY assembly instructions -14- assembly instructions -15- Step 8: Cap Rear Upright (8) with 2" x 3" Rect End Plug (55). Insert Guide Rod (9) into the sleeve on Rear Upright (8) by placing Rear Upright (8) top-down. Attach Rear Upright (8) to Triangular Link Plates (27) using two 1/2" x 4- 1/4" Hex Head Bolts (73), four 1/2" x 1-1/16" Washers (89) and two 1/2" Nylon Nuts (94). Attach each Rear Upright (8) to Rack (5) and Top Connect Beam (4) using 1/2" x 4" Hex Head Bolt (74), two 1/2" x 1-1/16" Washers (89) and 1/2" Nylon Nut (94). Attach 1" "C" Pin (93) to Weight Holder (33). Insert Weight Holders (33) into the holes in Rear Upright (8). NOTE: The threaded end of Weight Holder (33) MUST face inner side. Then tighten with 3/8" x 1-1/4" Washer (88) and 3/8" x 3/4" Hex Head Bolt (82). Slide 3" Rubber Doughnut (61) and Short Olympic Sleeve (35) onto Weight Holder (33) and secure with 5/16" x 1/2" Set Screw (86). Secure Guide Rods (9) with 5/16" x 3/8" Set Screws (85). ASSEMBLY Step 9: Cap Pec Dec Top Pulley Block (23) with 2" End Plugs (54). Cap Pec Dec Support (24) with 2" End Plugs (54). Insert four 3/4" Bushings (70) into the sleeves on the Pec Dec Support (24). Attach Pec Dec Top Pulley Block (23) and Pec Dec Support (24) to the Pec Dec Upright (6) using two 1/2" x 3-1/8" Hex Head Bolts (76), four 1/2" x 1- 1/16" Washers (89) and two 1/2" Nylon Nuts (94). Cap Right Pec Dec Arm (15) with two 2" Sq End Plugs (54). Slide 3/4" x 1- 1/2" Washer (87) and Pec Dec Adj Cam (25) onto the Right Pec Dec Arm (15). NOTE: The ringlet on the Pec Dec Adj Cam (25) MUST face outside. Lock the Pec Dec Adj Cam (25) with Pop Pin (67). Slide the Right Pec Dec Arm (15) onto the Pec Dec Support (24) and secure with 1/2" x 1-1/4" Washer (95) and 1/2" Nylon Nut (94). Cap 1/2" Nylon Nut (94) with Cap for Nut (56). Slide the 4" Pec Dec Foam Pad (42) onto the Right Pec Dec Arm (15). Repeat the same procedure for the Left Pec Dec Arm (16), Pec Dec Adj Cam (25) and Pec Dec Sopport (24). ASSEMBLY assembly instructions -16- Step 10: ROUTING THE TOP CABLE: Insert the bolt end of Top Cable (48) through Pulley T1 (Ball End outside). Route cable over Pulley T2, down and around pulley T3, up and around pulley T4, down and attach to Select Rod (32) at least 7 threads. ASSEMBLY assembly instructions -17- T1 T2 T4 T3 T5 T1 T2 T3 T4 T5 ball end TOP CABLE (48) bolt end Step 11: ROUTING THE PEC DEC CABLE: Attach the metal ball to the ringlet of the Pec Dec Adj Cam (25). Route the cable over pulley P2, down and around pulley P3, up and around pulley P4 then attach the other metal ball to the ringlet of the other Pec Dec Adj Cam (25). ASSEMBLY assembly instructions -18- metal ball end PEC DEC CABLE (50) metal ball end P2,P4 P1,P5 P3 Step 12: ROUTING THE LOWER CABLE: Insert the eye end of Lower Cable (49) through pulley L1. Route Cable beneath pulley L1 continue through pulley L2, up and around pulley L3, down and around pulley L4 then attach the eye end to Single Pulley Bracket (26) using Hookup (46). ASSEMBLY assembly instructions -19- ball end LOWER CABLE (49) eye end L1 L2 L3 L4 L5 P3 T3 L5 P3 L4 L3 T3 L1 L2 Step 13: Attach the Lat Bar (12) to the eyelet of Top Cable (48) using Hookup (46) then place Lat Bar (12) on the hook of Lat Bar Holder (19). Attach accessories (34,40,41) to the cable eyelet using Hookup (46) and Link Chain (47) (when necessary). ASSEMBLY assembly instructions -20- NOTE S notes -21 warranty WARRANTY Warranty Coverage: Smooth Fitness, Inc. ("Smooth Fitness") warrants to the original purchaser tha...


Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories