Log:
Évaluations - 1, GPA: 3 ( )

Instructions Star Trac, Modèle SPINNER V 7070

Fabricant : Star Trac
Taille : 1.46 mb
Nom Fichier : 620-7835B.pdf
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


If parts are missing, or if you have any operational questions, please call Star Trac’s Service department at (800) 503-1221; have your serial number ready. Serial No._____________________________________________ NOTE: If you are missing any of the parts listed above, inspect the packing material and the box for items that may have been overlooked. If parts are missing, or if you have any product questions, please call Star Trac’s Service Department at (800) 503-1221, p lease have your Spinner’s serial number ready. CAUTION: Damage to the bike during assembly is not covered as part of the limited Star Trac® warranty. Take care not to drop or lean the bike on the handle bar pop-pin. Carefully stand the bike up in the normal upright position on a stable surface so it will not tip over during assembly. Page 8 SPINNER® OWNER’S GUIDE ASSEMBLY Following these steps in order will minimize the build time and ensure proper assembly. 1. Install the Back Leg Lift up the rear of the bike frame and place the rear leg assembly in position under the frame, aligning the holes in the leg with the holes in the frame. Position the leg so the thicker end faces toward the front of the bike Using the 5mm hex wrench and a 13mm combination wrench insert 2- M10X55mm (rear-most holes) and 2-M10X65mm (front-most holes) button head screws, nuts and washers (under bolt head and nut), to secure the rear leg assembly to the frame. Tighten all hardware securely using a torque wrench to 85 lbs-in. 2. Install the Handlebar A. Insert pop -pin into frame handlebar post. Tightly secure pop -pin into place using multi-wrench. B. Position the handlebar post in its upright position (numbers will be right side up). Insert handlebar water bottle cage into the handlebar post. Secure assembly with the: · (2) M8x1.25, 16mm Flat Head Screw · 5mm Hex Wrench · Torque down to 60 lbs-in · (1) M8x1.25, 16mm Socket Set Screw · 4mm Hex Wrench · Torque down to 60 lbs-in C. Slide the handlebar post into the frame making sure the holes face the front of the bike. Allow the post to go into the frame all the way in to level 1 and align the pop pin so it snaps into the hole then tighten the pop pin and test for steadiness. Loosen the pop pin and raise the handlebar to its highest position number 10 and tighten the pop pin and test for steadiness. Page 9 Step 1 Step 2A Step 2B Step 2C SPINNER® OWNER’S GUIDE 3. Install the Front Leg NOTE: The front foot assembly has wheels attached to the front edge. Be sure the wheels face forward when installing the front leg assembly. Stand the bike frame upright and gently tip the front of the bike up and position the front foot under the frame, with the wheels facing forward. Attach the front foot assembly to the frame, aligning the holes in the foot with the holes in the frame. Position the leg so the thicker end and wheels face toward the front of the bike Using the 5mm hex wrench and a 13mm combination wrench insert 2- M10X55mm (rear-most holes) and 2-M10X65mm (front-most holes) button head screws, nuts and washers (under bolt head and nut), to secure the front leg assembly to the frame. Tighten all hardware securely using a torque wrench to 85 lbs-in. Move the bike to a flat surface and adjust the four leveling feet so the bike is stable. 4. Install the Saddle and Seat Slider A. Disengage pop-pin by loosening then pulling away from the frame. While still holding onto the pop -pin, install the seat post into the frame and lower it to the lowest position and tighten the pop pin securely once again. B. Slide the seat slide into the top of the seat post with the saddle pointed towards the front of the bike. Rotate the seat slider lock knob as needed so that the slider clamp is in alignment with the guide rail There is a locking pin under the saddle that has to be pulled up as you move the slider into position. Release the pin when the indicator is within the 0 to 9 range. Test the seat slide for proper operation and full travel. Step 3 Step 4A Step 4B Page 10 SPINNER® OWNER’S GUIDE 5. Install the Pedals NOTE: The pedal shafts are marked “R” and “L”. Trying to install the pedals on the wrong side may damage the pedal and the crank arm take caution to attach the pedals to the correct side of the bike. Install the pedals on the pedal cranks using a 15mm open-end wrench and tighten securely. Turn the left pedal spindle counterclockwise when Step 5 threading into the left crank arm; turn the right pedal spindle clockwise when threading into the right crank arm. You have now completed the assembly of your SPINNER® NXT. !Attention! Crank bolt must be re-torqued after the first 10 hours of use. Refer to Preventive Maintenance section page 27. Page 11 SPINNER® OWNER’S GUIDE SPINNER® ELITE / PRO ASSEMBLY AND SETUP Use the following procedures to unpack and assemble your SPINNER®ELITE / PRO. UNPACKING Prepare the area that you will be unpacking and assembling the bike to be free from debris that may cause damage. Observe all safety precaut...

Ce manuel est également adapté pour les modèles :
Formateurs - SPINNER V 7060 (1.46 mb)
Formateurs - SPINNER V 7080 (1.46 mb)
Formateurs - SPINNER V 7090 (1.46 mb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories