Log:
Évaluations - 2, GPA: 3.5 ( )

Instructions Broan, Modèle LOSONE SELECT L150L

Fabricant : Broan
Taille : 1.13 mb
Nom Fichier :
Langue d'enseignement: enesfr
Aller à la télécharger



Facilité d'utilisation


Do not use to exhaust hazardous or explosive materials and vapors. 2. To avoid motor bearing damage and noisy and/or unbalanced impellers, keep drywall spray, construction dust, etc. off power unit. 3. If ventilator is installed in an unconditioned space (such as an attic): Surround the ventilator with thermal insulation - to minimize possible condensation. 4. Please read specification label on product for further information and requirements. TABLE OF CONTENTS This manual is divided into sections as follows: • “TYPICAL INSTALLATION” This section shows a common installation in new and existing, frame construction. -Mounting (new construction) -Mounting (existing construction) -Wiring -Ducting (straight through blower discharge) • “MOUNTING OPTIONS” • “WIRING OPTIONS” -Wiring Plate Position • “DUCTING OPTIONS” -Blower Discharge Positions -Ducting (right angle blower discharge) • “USE AND CARE” • “SERVICE PARTS” • “WARRANTY” Installer: Leave this manual with the homeowner. Homeowner: Use and Care information on page 3. MODELS L100L • L150L • L200L • L250L • L300L Page 2 .......... .......... .......... .......... yyyyy yyyyy yyyyy yyyyy ...... ...... ...... yyy yyy yyy .......... .......... yyyyy yyyyy ...... ...... ...... yyy yyy yyy.. ..y y .. ..y y .. ..y y ..y..y .. ..y y .. ..y y TYPICAL INSTALLATION MOUNTING (New Frame Construction) CEILING JOIST (16” centers shown) ROUND DUCT* Factory-shipped unit installed in new construction. MOUNTING SCREW Blower factory-shipped in straight through discharge position. Mounting brackets factory-shipped in position for .” ceiling material. ADDITIONAL 1.” FRAMING MOUNTING (Existing Frame Construction) Factory-shipped unit installed in existing construction. TYPICAL INSTALLATION WIRING WIRING PLATE WHITE TO WHITE BLACK TO BLACK TOP / BACK OF HOUSING 120 VAC LINE IN GROUND TO WIRING PLATE ROUND DUCT* FINISHED CEILING MATERIAL CEILING JOIST (16” centers shown) 2 X 4 FRAMING (wide side down) MOUNTING BRACKETS (Attached to opposite sides of housing & upside-down) DUCTING (Horizontal blower discharge) Two ways to connect ductwork to a factory-shipped unit. Ventilator can be wired from outside of housing. Use UL approved connectors to wire per local codes. ROOF CAP ROUND ELBOW* ROUND DUCT* WALL CAP IMPORTANT: Remove shipping tape from damper Remove the shipping tape from the damper flap and make sure that damper flap opens and closes freely inside the ductwork. Use duct tape to make ductwork connections secure and air-tight. Remove shipping ring from blower inlet Remove the shipping ring from the blower inlet before operating the ventilator. * L100L & L150L use 6” round duct. L200L, L250L, & L300L use 8” round duct. * L100L & L150L use 6” round duct. L200L, L250L, & L300L use 8” round duct. MODELS L100L • L150L • L200L • L250L • L300L Page 3 ..y..y ..y..y..y..y 12." 91/ 2" to 101/ 2" ..y..y..y ..y..y..y..y 12." 1." to 2." ...... ...... yyy ..y..y..y MOUNTING OPTIONS WIRING OPTIONS DUCTING OPTIONS ..y..y ..y..y..y..y 12." 11/ 8" MAX. Mounting brackets in factory-shipped position. (Outlet parallel to joists.) (New construction) ..y..y..y ..y.....

Ce manuel est également adapté pour les modèles :
Vidéo - LOSONE SELECT L100L (1.13 mb)
Vidéo - LOSONE SELECT L200L (1.13 mb)
Vidéo - LOSONE SELECT L250L (1.13 mb)
Vidéo - LOSONE SELECT L300L (1.13 mb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories