Log:
Évaluations - 3, GPA: 3.7 ( )

Instructions Cecilware, Modèle ME15-GN

Fabricant : Cecilware
Taille : 1.21 mb
Nom Fichier :
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


The unit fills at the rate of 1 gallon per minute. When the water level becomes visible in the sight gauge, turn the thermostat knob to the ON position. The boiler will now automatically fill to capacity and heat the water. LIGHTING AND ADJUSTMENT: Water must be visible in the sight glass before lighting to pilot. Turn the thermostat knob to its lowest position. Turn gas cock dial to PILOT position. Depress gas cock dial and light pilot with a long lighted match through the opening located on the bottom of the urn. Hold in depressed position for approximately 30 sec. or until pilot remains lit when dial is released. 3 NOTE: On the first lighting it may be necessary to hold the dial for a longer period to allow trapped air to escape from the line. DIAL SETTINGS AND CORRESPONDING WATER TEMPERATURES: “1”= 50F, “10”=198F RELIGHTING: Shut off all gas and wait approximately 5 minutes before relighting the pilot. SHUTTING DOWN: For temporary shut down, turn the thermostat to lowest or OFF position, then turn gas cock dial to PILOT position. To shut boiler down completely, partially depress and turn gas cock dial to OFF position. MAINTENANCE OR REPAIR: The owner should contact the manufacturer or an approved local service company for maintenance or repair of the unit. CLEANING: The outside of the unit should be cleaned on a regular basis using a soap solution and a soft cloth or sponge. Abrasive cleaners are not recommended. For cleaning the burner see section on removal and cleaning. FOR QUALIFIED SERVICE PERSONNEL ONLY THERMOSTAT CALIBRATION: To adjust the temperature of the water in the urn, turn the thermostat knob to “10”and remove the knob without moving the thermostat shaft. Place narrow bladed screwdriver (1/8”) into the hollow thermostat shaft and engage center adjustment screw. When thermometer reading approaches 198F slowly turn the adjustment screw clockwise until the burner goes out. Turning the screw counter-clockwise will increase the temperature. REPLACING SOLENOID VALVE: 1. Shut off water supply and disconnect power to the boiler. 2. Drain off approx. 1 gallon of water from the boiler. 3. Disconnect hose nut from solenoid inlet. 4. Disconnect wires from terminals on solenoid coil. 5. Remove solenoid from cabinet (2 screws). 6. Remove silicon hose from solenoid and slip onto new solenoid and assemble back in reverse order. SAFETY PILOT: Remove pilot adjustment cap on the gas valve and turn adjustment screw to provide properly sized flame (3/4 inch long).Replace the cap. Pilot Adjustment Screw BURNER: The burner is factory set for maximum performance. Should further adjustments be required loosen slotted hex screw on side of venturi and rotate air shutter until flame with soft blue inner core is obtained. BURNER REMOVAL: The burner can be removed with the unit standing in operating position. Turn off the gas flow to the unit. Allow the burner to cool off. Remove the wing nut holding the burner to the frame. Pull down the free burner end, enough to clear the threaded stud and pull the burner horizontally away from the manifold orifice. The burner can now be cleaned or replaced. To reinstall, reverse the above procedure. Hex ScrewAir Shutter BURNER MAITENANCE: The burner should be cleaned both inside the venturi portion and on the outside using a soft bristle brush. The burner must be replaced into the same position as prior to removal. Once a year, a qualified service agency should be contacted to inspect the appliance for safe and proper operation. 5 PARTS LIST No. PART # DESCRIPTION ME10-GN ME15-GN B012A HEYCO BUSHING STRAIGHT, SMALL 1 1 B033A TERMINAL BLOCK 3 POSITION 1 1 C032S LINE CORD W/ PLUG 120V 15A 1 1 CD257 WATER INLET VALVE 120V 1 1 CH32A THERMOSTAT HARNESS ASSEMBLY 1 1 CH415 WIRING HARNESS ASSEMBLY 1 1 D022Q FAUCET, SHANK W/ VALVE 1 1 D031A GUAGE SHIELD, 14 1/2" 1 0 D066A GUAGE SHIELD, 18" 0 1 E009A OVERFLOW FITTING W/ NUT 1 1 F091A ORIFICE, LP (LP UNITS ONLY) 1 1 F124A ORIFICE, NAT (NATURAL GAS UNITS ONLY) 1 1 F136A PILOT HOUSING 1 1 F178A THERMOPILE 24" 1 1 G052A T-BURNER 1 1 H080A TUBING, OVERFLOW - CU 5/8 X 16.5 0 1 H081A TUBING, OVERFLOW - CU 5/8 X 13.5 1 0 H345A PILOT TUBE 1/4" ALUMINUM 1 1 H346A GAS VALVE TUBE 3/8" ALUMINUM 1 1 J015A NIPPLE 3/8NPT x 4" BLACK STEEL 1 1 J040A STREET ELBOW 3/8NPT BLACK STEEL 1 1 J041A REDUCING COUPLING 3/8 x 1/8 1 1 K039A 1/4 x 1/8 COMPRESSION FITTING 1 1 K088A ORIFICE BODY 3305 R 1 1 K110A NUT, 3/8 NPT CHROMIUM PLATED 1 1 K192A FITTING ALUMINUM INLET (NATURAL GAS UNITS ONLY) 1 1 K193A FTG 1/8 NPT x 1/4 ANGLE 1 1 K491A HOSE NUT ASSEMBLY (AMERICAN THREADS) 1 1 K525A 90 DEGREE ELBOW 1/2" TUBE 1 1 K549A FITTING ALUMINUM INLET (LP UNITS ONLY) 1 1 K635A ELBOW COMPRESSION FITTING 3/8 x 3/8 BRASS 2 2 K636A HEX REDUCING BUSHING 1 1 K810Q LEVEL SENSOR, DUAL PROBE 1 1 L007A THERMOMETER BREW DIAL 1 1 L299A ON - OFF SWITCH 20 AMP 1 1 L621A GAS VALVE NAT. (NATURAL GAS UNITS) 1 1 L622A THERMOSTAT 1 1 L690A DUAL LEVEL CONTROL BOARD 120V 1 1 L347P GAS VALVE LP. (LP UN...

Ce manuel est également adapté pour les modèles :
Chauffe-eau - ME10-GN (1.21 mb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories