![@name](/images/flag/s/en.gif)
F. Boiler Control 1. The following safety controls shall be provided: a. High limit control b. Flow switch c. PSIG ASME pressure relief valve, piped by the installer to an approved drain d. Temperature and pressure gauge 2. The boiler(s) shall be equipped with an energy-saving pump control relay (Economaster), mounted and wired, which automatically shuts off the boiler pump at a set period after boiler shut-down (adjustable for two settings of five or ten minutes) to avoid standby losses associa