|
Facilité d'utilisation
State of Massachusetts: The installation must be made by a licensed plumber or gas fitter in the Commonwealth of Massachusetts. The state of Massachusetts requires that a flexible appliance connector cannot exceed three feet in length. Sellers of unvented propane or natural gas-fired supplemental room heaters shall provide to each purchaser a copy of 527 CMR 30 upon sale of the unit. In the State of Massachusetts, unvented propane and natural gas-fired space heaters shall be prohibited in bedrooms and bathrooms. The installation must conform with local codes or, in the absence of local codes, with the National Fuel Gas Code, ANSI Z223.1/ NFPA 54.* *Available from the American National Standards Institute, Inc., 11 West 42nd St., New York, N.Y. 10036. 23200-0-1206 Page 3 Page 4 23200-0-1206 Clearances to combustibles Sidewall Clearances: The clearance from the inside of the firebox to perpendicular combustible side wall should not be less than 6". See Figure 1. Firebox Side and Back Clearances: The firebox outer casing side and back flanges are zero clearance to combustibles. Top Framing and Finishing: Combustible framing may rest on top of standoffs. Combustible finishing materials may extend to the top standoff screws on the front edge of the outer wrap. See Figure 2. Ceiling Clearances: The ceiling height should not be less than 42" from the top of the hood. See Figure 3. Mantel Clearances: Vent free firebox models must use the hood supplied with the firebox, or one of the optional hood kits available for each model. If a combustible mantel is installed, it must meet the clearance requirements detailed below. Grate Clearance: The minimum clearance between the front legs of the grate and front edge of the firebox is 2". Leave at least 36" clearance from the front of the firebox. Any vent-free Gas Log Heater must be “For use with approved ANSI Z21.11.2 unvented room heater.” Follow and complete the installation instructions of the gas log set and the requirements of this firebox. Check all fittings for leaks before lighting the gas log set. In planning the installation for the firebox, it is necessary to determine where the unit is to be installed and whether optional accessories are desired. Gas supply piping should also be planned at this time. A gas shut off must be in this line. 45° 6” 3” MAX. PERPENDICULAR SIDE WALL FRONT FACE (SIDE) FIREBOX (TOP VIEW) COMBUSTIBLE MATERIALS ALLOWED IN SHADED AREAS FIREBOX STAND OFF FINISH WITH TRIM KIT OR NON-COMBUSTIBLE MATERIAL AS DESIRED. COMBUSTIBLE FINISHED WALL 2 X 4 OR MANTEL HEADER MANTEL HOOD 13” 10” 12” MAX 42” MIN. (CEILING TO TOP OF HOOD) 11 1/2” MIN. FIREBOX FACE 84” MIN. (CEILING TO FLOOR) CEILING COMBUSTIBLES ALLOWED 3/8” COMBUSTIBLE CLEARANCE REQUIRED FROM TOP EDGE OF FIREBOX 10” 22” 8” 20” 6 .” 18” 5” 16” 3 .” 14” 2” 12 .” 3/4” 24 .” 0” Figure 1 Figure 2 Figure 3 CLEARANCES FIREBOX INSTALLATION INSTRUCTIONS 23200-0-1206 Page 5 Deluxe Vent-Free Firebox Framing Dimensions (in inches) "A" "B" "...
Ce manuel est également adapté pour les modèles :Cheminées - VFD36FB2CL-1 (4.64 mb)
Cheminées - VFD36FB2DF-1 (4.64 mb)
Cheminées - FD42FB2DF-1 (4.64 mb)
Cheminées - VFD32FB0L-1 (4.64 mb)