Each of these items has the potential, if misused or handled improperly, to cause bodily injury or death. It is the obligation and responsibility of operating/service personnel to identify and recognize these inherent hazards, protect themselves, and proceed safely in completing their tasks. Failure to comply with any of these requirements could result in serious damage to the equipment and the property in which it is situated, as well as severe personal injury or death to themselves and people
UNITS, TANKS AND PIPING .......................10 VENT AND COMBUSTION AIR HOODS..................11 OPT ECONO/MOTORIZED DAMPER RAIN HOOD .........11 ENTHALPY SET POINT ADJUSTMENT........................11 PWR EXH/BARO RELIEF DMPR & RAIN HOOD OPT.......11 OPERATION ...................................19 COOLING SYSTEM ..................................19 PRELIMINARY OPERATION COOLING ..................19 COOLING SEQUENCE OF OPERATION .................19 NO OUTDOOR AIR OPTIONS ............
All internal unit resistances have been deducted from the total static pressure of the blower. The Factory Setting 5 Unitary Products 17 035-17233-000-C-0702 TABLE 13: STATIC RESISTANCES1 RESISTANCE, IWG CFM 15 TON 20 TON 4500 5765 7200 6000 7000 9400 WET COIL 0.1 0.1 0.1 0.1 0.1 0.1 ECONOMIZER OPTION 0.1 0.1 0.1 0.1 0.1 0.1 HORIZONTAL DUCT CONN.2 0.2 0.3 0.5 0.2 0.3 0.5 1 Deduct these resistance values from the available unit ESP values listed in the respective blower perfor