pipe or 1/2 inch copper sweat connections. If the Moen Slip Fit spout is used, a 1/2 inch copper drop and lookout may be used. Measurements These are shown in the drawings. The depth measurement is critical. Use the front face of the plaster ground as a reference point for the finished wall position, including tile ( 1-3/4"[44mm] ). The supply piping centerline should be a maxium of 2" (51mm) and a minimum of 1" (25mm) behind the wall surface. Use thick wall handle extension kit 96945 for wall t
If the retainer clip is not properly installed, water pressure could force the cartridge out of the casting. Personal injury or water damage to the premises could result. Visit Moen's Web Site at WITH STOPS WITHOUT STOPS Stop Operation CC -This type is integral with casting, actuated by screwdriver, and require a 90° turn to open or close. When the screwdriver slot is vertical, the rubber stop is closed, and when the slot is horizontal, the rubber stop is open. IPS -This type has been added to t
Secure all pipes and the shower and tub drop ells. Use thread seal tape on all threads. Flushing IMPORTANT: Before closing all wall openings, pressure test valve and complete sys- tem using flushing instructions Pipe chips, sand and other solids found in new and renovated plumbing can damage the sealing surfaces of the cartridge causing a leak or cause the spool to become blocked. To avoid damage, DO NOT TURN ON SUPPLY VALVES until instructed below. Make sure both hot and cold supplies are off.
1. Rotate the handle counterclockwise to the stop, let the water run for several minutes to purge cool water from the hot water supply line, check the hot water temperature. 2. Rotate handle clockwise to off. Remove handle parts, see "Disassembly" and temperature limit stop, rotate the stop clockwise to decrease (counterclockwise to increase) maximum hot water temperature and reinstall into key stop. 3. For handle styles A & B replace handle, for style C replace handle adapter, do not use handle
Connections are either 1/2 inch I.P.S. pipe or 1/2 inch copper sweat connections. If the Moen Slip Fit spout is used, a 1/2 inch copper drop and lookout may be used. Measurements These are shown in the drawings. The depth measurement is critical. Use the front face of the plaster ground as a reference point for the finished wall position, including tile ( 1-3/4"[44mm] ). The supply piping centerline should be a maxium of 2" (51mm) and a minimum of 1" (25mm) behind the wall surface. Use thick wal
Secure all pipes and the shower and tub drop ells. Use thread seal tape on all threads. Flushing IMPORTANT: Before closing all wall openings, pressure test valve and complete sys- tem using flushing instructions Pipe chips, sand and other solids found in new and renovated plumbing can damage the sealing surfaces of the cartridge causing a leak or cause the spool to become blocked. To avoid damage, DO NOT TURN ON SUPPLY VALVES until instructed below. Make sure both hot and cold supplies are off.
Secure all pipes and the shower and tub drop ells. Use thread seal tape on all threads. Flushing IMPORTANT: Before closing all wall openings, pressure test valve and complete sys- tem using flushing instructions Pipe chips, sand and other solids found in new and renovated plumbing can damage the sealing surfaces of the cartridge causing a leak or cause the spool to become blocked. To avoid damage, DO NOT TURN ON SUPPLY VALVES until instructed below. Make sure both hot and cold supplies are off.