Log:
Évaluations - 2, GPA: 4 ( )

Instructions American Standard, Modèle 2390.202

Fabricant : American Standard
Taille : 96.16 kb
Nom Fichier : 1f21cd8a-8508-467f-b4b4-124701e9d20d.pdf
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


THREADS 1-1/2 TUBING THREAD INSIDE ROUGH FLOOR 445mm (17-1/2) PROVIDE FULL LENGTH SUPPORT STRINGER AT THIS POINT 435mm (17-1/8) DRAIN SHOE BELOW FLOOR ROUGH 2390.202 ICH 2391.202 ICH ABOVE FLOOR ROUGH 2392.202 ICH 2393.202 ICH 356mm (14) ROUGH FLOOR 2390.202.ICH 2391.202.ICH Princeton 2392.202.ICH 2393.202.ICH 2390.202.IPB 2391.202.IPB w/Integral 2392.202.IPB 2393.202.IPB Installation Observe Local Plumbing Introduction: Thank you for selecting have been the benchmarks of fine quality To help insure that the installation process will proceed instructions carefully before you begin. Also carefully unpack and examine your new plumbing fixture. * 1527mm (60-1/8) 762mm(30)TUB WIDTH LEVELING SUPPORT STRINGER 51 x 102mm (2 X 4) Note recess is 1527 x 813mm (60-1/8 x 32). Cut a 229 x 305mm (9 x 12) floor for drain, centered 362mm (14-1/4) as shown for below floor rough. Locate studs as required, then ensure rough opening dimensions are proper and supports are and square. * Install stringer as shown (346mm [13-5/8] for through the floor drain or 435mm [17-1/8] for above the floor drain.) 362mm(14-1/4) 229 x 305mm (9 x 12) FLOOR CUTOUT FOR DRAIN 813mm (32) FRAMING INSTRUCTIONS1 The Drain Assembly is enclosed with tub models listed above-locate and retain for tub installation before discarding tub carton IMPORTANT FOR AFTER-SALES SERVICE CALL 1 (800) 442-1902 WEEKDAYS. © American Standard Inc. 2003 791174-100 Rev. G INSTALLATION AMERICANSTANDARD FINISHED TILE FLOOR UNDERLAYMENT SUB FLOOR NAIL OR DRYWALL SCREW EVERY STUD 4 32 Remove Lift and Turn parts are included. Remove Stopper to closed position, (Re-install Stopper after Drain Apply plumbers putty around drain end of tailpiece. Set Tailpiece in drain hole. (Lift and Turn and reinstalled after tub installation is completed.) From underside of tub: Place Rubber Wedge Seal and center in hole, place Brass Washer on Tailpiece, side first. Tighten Locking Nut to obtain a uniform seal and hole in tub. DO NOT OVERTIGHTEN! Final hook up to tub waste can be made using either internal threads (1-1/2 tubing 1-1/2—28 thd.), or external threads on Tailpiece (1-1/2—for appropriate tub fittings. DRAIN INSTALLATION TAILPIECE RUBBER DRAIN SEAL BRASS DRAIN WASHER BRASS DRAIN NUT STOPPER ASSEMBLY STOPPER KNOB LIFT AND TURN STOPPER ASSEMBLY SET TAILPIECE APPLY PIPE JOINT COMPOUND TO THREADS APPLY PLUMBERS PUTTY ASSEMBLE AND TIGHTEN TURN TO REMOVE STOPPER IN CLOSED POSITION (UNSCREW STOPPER ONCE IN CLOSED POSITION TO REMOVE) STOPPER IN OPEN POSITION 1 2 3 4 1 2 4 3 2 STUD SHIM DRY WALL TILE SEALANT TUB 2 x 4 WOOD STRINGER FULL LENGTH ROOFING NAIL 2 x 4 WOOD STRINGER FULL LENGTH STEEL STUD SHIM DRY WALL WASHER TILE SEALANT TUB 4" DRYWALL SCREW Below is shown typical cross sections of the tub rim showing typical wall constructions. WOOD STUDS STEEL STUDS Position bathtub within check drain clearance hole roofing nails immediately above To secure the tub to steel studs, Caution: Take Extra Care When Driving Nails or Screws To Avoid Damaging The Tub. The tile or similar finished floor will tub apron also holding the tub in place. NOTE: Warranty will be voided if the drain is installed set in place. INSTALLATION AMERICANSTANDARD FINISHED TILE FLOOR UNDERLAYMENT SUB FLOOR NAIL OR DRYWALL SCREW EVERY STUD 4 32 Remove Lift and Turn parts are included. Remove Stopper to closed position, (Re-install Stopper after Drain Apply plumbers putty around drain end of tailpiece. Set Tailpiece in drain hole. (Lift and Turn and reinstalled after tub installation is completed.) From underside of tub: Place Rubber Wedge Seal and center in hole, place Brass Washer on Tailpiece, side first. Tighten Locking Nut to obtain a uniform seal and hole in tub. DO NOT OVERTIGHTEN! Final hook up to tub waste can be made using either internal threads (1-1/2 tubing 1-1/2—28 thd.), or external threads on Tailpiece (1-1/2—for appropriate tub fittings. DRAIN INSTALLATION TAILPIECE RUBBER DRAIN SEAL BRASS DRAIN WASHER BRASS DRAIN NUT STOPPER ASSEMBLY STOPPER KNOB LIFT AND TURN STOPPER ASSEMBLY SET TAILPIECE APPLY PIPE JOINT COMPOUND TO THREADS APPLY PLUMBERS PUTTY ASSEMBLE AND TIGHTEN TURN TO REMOVE STOPPER IN CLOSED POSITION (UNSCREW STOPPER ONCE IN CLOSED POSITION TO REMOVE) STOPPER IN OPEN POSITION 1 2 3 4 1 2 4 3 2 STUD SHIM DRY WALL TILE SEALANT TUB 2 x 4 WOOD STRINGER FULL LENGTH ROOFING NAIL 2 x 4 WOOD STRINGER FULL LENGTH STEEL STUD SHIM DRY WALL WASHER TILE SEALANT TUB 4" DRYWALL SCREW Below is shown typical cross sections of the tub rim showing typical wall constructions. WOOD STUDS STEEL STUDS Position bathtub within check drain clearance hole roofing nails immediately above To secure the tub to steel studs, Caution: Take Extra Care When Driving Nails or Screws To Avoid Damaging The Tub. The tile or similar finished floor will tub apron also holding the tub in place. NOTE: Warranty will be voided if the drain is installed set in place. 791174-100 Rev. G ...

Ce manuel est également adapté pour les modèles :
Autres accessoires pour la maison - 2391.202 (96.16 kb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories