![@name](/images/flag/s/en.gif)
You will be prompted to fully tighten all fasteners later. Place the Base Frame (1) on the floor. Cap the Base Frame (1) with one 2" Sq End Cap (48) and two 1-3/4" Sq End Plugs (49). Insert two 1" Plastic Bushings (60) into the holes in the Base Frame (1). Cap the Side Base (2) with one 2" Sq End Cap (48) and one 2" Sq End Plug (50). Cap the Upright (3) with one 1-1/2" End Cap (53) and one 2" x 3" Rect End Plug (52). Attach the Adj Stopper (63) to the Upright (3). Attach the Side Base (2) and Up