Log:
Évaluations - 4, GPA: 3.8 ( )

Instructions Vermont Casting, Modèle 3970

Fabricant : Vermont Casting
Taille : 882.07 kb
Nom Fichier :
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


Also, be sure to align holes on the pipe with the holes on the flue collar of the firebox. Fasten the pipe to the holes in the flue collar with the #12 x 1/2” sheet metal screws provided. (Fig. 23) Inner Flue Collar Vent Starter Pipe Seal all around crimped end Inner Elbow ST398b Fig. 22 Install inner starter pipe and inner elbow. ST479a Fig. 23 Fasten outer pipe with #12 x 1/2” sheet metal screws. Side Wall Termination Assembly 1. Locate the vent opening on the wall. Refer to Figures 20 & 21, to determine the minimum centerline of wall opening. It may be necessary to first position the stove and measure to find the hole location. Depending on whether the wall is made of combustible materials, cut the opening to the size shown in Figure 24. Combustible wall openings Fig. 24 Locate vent opening. VO584-100a 9..." (240mm) 9..." (240mm) 7..." (191mm) Vent Opening - Combustible Wall Vent Opening - Noncombustible Wall 2. Measure the wall thickness and cut the wall sleeve sections to proper length (MAXIMUM 12”). Assemble the sleeve with the #8 sheet metal screws supplied. Attach the firestop plate to the sleeve end with the holes. (Fig. 25) NOTE: The wall sleeve is required in combustible walls only. 3. Install the Wall Firestop/Sleeve assembly into the wall cutout and fasten the firestop to the wall cutout framing members. (Fig. 25) 12” (305mm) Max. Length Sleeve #8 Sheet Metal Screws Firestop ZCS103 Fig. 25 Assemble the wall sleeve and firestop. 4. If necessary, measure to determine the vertical length (X) of pipe required from the first (transition) elbow to the wall cutout centerline, including a 2” overlap at the joint. (Fig. 26) Use a hacksaw or tin snips to trim the pipe as needed. 5. Install first the inner then the outer straight pipe section(s), trimmed end down, to the point of the elbow. Drill 3 holes through each joint and fasten with sheet metal screws. 6. Install the elbow using 3 sheet metal screws at each joint. must be framed as shown in Figure 24. 7. Measure, and cut if necessary, the appropriate length of pipe section needed to make the connection through the wall. Include a 2” overlap; i.e. from Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters X ST478 Fig. 26 Determine the vertical pipe length. the elbow to the outside wall face, about 2” or the distance required if installing a second 90° elbow. (Fig. 27) 8. Slip the wall plate and trim collar over the interior end of the horizontal pipe and install into the wall sleeve. Seal the joint inside the wall plate if needed to keep cold air from being drawn into the home. X ST215 Fig. 27 Measure the horizontal length. 9. Connect the horizontal pipe to the elbow. Fasten the wall plate to the pipe with three sheet metal screws. Slide the trim collar up against the wall plate to cover the screws. (Fig. 28) 10.Install the vent terminal. (Fig. 29) Guide the inner and outer vent termination collars into the adjacent pipes. Double check that the vent pipes overlap the collars by 2”. Fasten the termination to the wall with the screws provided, and caulk the joint with weatherproof sealant. 11.Install Charcoal Gray Pipe Rings (#7FSDRG) or Polished Brass Pipe Rings (#7FSDRP) at pipe joints, if desired. Trim Collar Wall Sleeve Wall Plate ST216 Fig. 28 Install the horizontal pipe and wall plate parts. Seal Both Terminal Ends Caulk Plate Joint with Weatherproof Sealant ST217 Fig. 29 Install the vent terminal. Vent Termination Below Grade Install Snorkel #7TDVSNORK when it is not possible to meet the required vent termination clearances of 12” (305mm) above grade level. The snorkel kit will allow installation depth of down to 7” (178mm) below grade level. The seven inches is measured from the center of the horizontal vent pipe as it penetrates the wall. If the venting system is installed below grade, a window well must be installed with adequate and proper drainage. (Fig. 30) NOTE: Be sure to maintain side wall clearances and vent run restrictions. Refer to Figures 3 through 9. 1. Establish the vent hole through the wall. 2. Remove soil to a depth of approximately 16” (400mm) below the base of the snorkel. Install a window well (not supplied). Refill the hole with 12” (305mm) of coarse gravel and maintain a clearance of at least 4” (102mm) below the snorkel. (Fig. 30) 3. Install the vent system as described on Pages 1417. 4. Be sure to make a watertight joint around the vent pipe joint at the inside and outside wall joints. 5. Apply high temperature sealant around the inner and outer snorkel collars. Join the pipes and fasten the snorkel termination to the wall with the screws provided. Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters 6. Level the soil to maintain a 4” clearance below the snorkel. If the foundation is recessed, use extension brackets (not supplied) to fasten the lower portion of the snorkel. Fasten the brackets to the wall first, and then fasten to the snorkel with self-tapping #8 x 1/2” sheet metal screws. Extend the vent pipes o...

Ce manuel est également adapté pour les modèles :
Ventilateurs - 3926 (882.07 kb)
Ventilateurs - 3930 (882.07 kb)
Ventilateurs - 3936 (882.07 kb)
Ventilateurs - 3960 (882.07 kb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories