Log:
Évaluations - , GPA: ( )

Instructions Vulcan-Hart, Modèle IR2(B)

Fabricant : Vulcan-Hart
Taille : 10.64 mb
Nom Fichier :

Langue d'enseignement: en

Le document est chargé, s'il vous plaît patienter
Le document est chargé, s'il vous plaît patienter

Facilité d'utilisation


NOTE: When installing bottom assembly, angle metal should be at the rear of the oven. Oven Door Handle (GHCB40) 1. Remove the caps from the oven door. 2. Slide the augratin oven bottom assembly from the broiler. – 10 – 2. Remove two screws and the oven door handle from the oven door. 3. Reverse the procedure to install. BROILER GRID TRAY (ALL MODELS) WARNING: SHUT OFF THE GAS BEFORE SERVICING. 1. Allow the broiler grids to cool. GRID CARRIAGE ASSEMBLY (ALL MODELS) WARNING: SHUT OFF THE GAS BEFORE SERVICING. WARNING: ALL GAS JOINTS DISTURBED DURING SERVICING MUST BE CHECKED FOR LEAKS. CHECK WITH SOAP AND WATER SOLUTION (BUBBLES). DO NOT USE AN OPEN FLAME. WARNING: SPRING AND HOOK BOLT ARE UNDER TENSION. 1. Remove the broiler grid tray as outlined in Broiler Grid Tray. 2. Remove cover manifold cover assembly as outlined in Covers, Panels and Handles. 3.Carefully remove the two springs from the threaded hook bolts and the lower lever arm assembly. 2. Remove the two broiler grids from the broiler grid tray. 3. Remove two stop bolts and nuts from the broiler. 4. Carefully pull out the broiler grid tray to remove it from the grid carriage. 5. Reverse the procedure to install. – 11 – 4. Remove the grid handle from the grid arm lifting assembly. 5. Remove two bolts, six washers and two nuts from the grid arm lifting assembly and the grid carriage assembly. 6. Remove the grid arm lifting assembly from the grid carriage assembly and the broiler. BURNER CERAMICS (GHCB40) WARNING: SHUT OFF THE GAS BEFORE SERVICING. NOTE: Lower broiler pan for easier access. 1. Allow the burner ceramics to cool. 2. Carefully push up on the side and center ceramics to remove from the broiler. 3. Reverse the procedure to install. 7. Remove the four cotter pins and bolts (two each side) from the lever arm bracket and upper and lower lever arm assemblies. NOTE: When installing grid arm lifting assembly, install washers between grid arm lifting assembly and grid carriage assembly. 8. Reverse the procedure to install. – 12 – BURNER ASSEMBLY GHCB40 & HCB2(B) WARNING: SHUT OFF THE GAS BEFORE SERVICING. 1. Remove the burner ceramics as outlined under Burner Ceramics. 2. Remove burner box cover as outlined in Controls, Panels and Handles. 3. Allow the burner assembly to cool. 4. Lift the rear of the burner assembly and remove it from the broiler. CAUTION: Make sure that you do not damage the pilot nozzle when you remove the burner assembly. 5. Reverse the procedure to install. GHIR44 WARNING: SHUT OFF THE GAS BEFORE SERVICING. 1. Allow the burner assembly to cool. 2. Lift the rear of the burner assembly off the alignment pins. 3. Carefully move the burner assembly to the rear of the broiler and then remove burner from the broiler. CAUTION: Make sure that you do not damage the pilot burner nozzle when you remove the burner assembly. 4. Reverse the procedure to install. – 13 – HEAT SHIELD (GHIR44) WARNING: SHUT OFF THE GAS BEFORE SERVICING. 1. Remove burner assemblies as outlined in Burn...

Ce manuel est également adapté pour les modèles :
Chauffe-eau - GHCB40 (10.64 mb)
Chauffe-eau - GHCB44 (10.64 mb)
Chauffe-eau - GHIR44 (10.64 mb)
Chauffe-eau - GHMCB44 (10.64 mb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories