|
Facilité d'utilisation
Perform steps in the order given. Failure to comply could result in severe personal injury, death, or substantial property damage. WARNING Save this manual for future reference. Contents HAZARD DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . .2 PLEASE READ BEFORE PROCEEDING . . . . . . . . . . . .3 THE KNIGHT XL -- HOW IT WORKS . . . . . . . . . . . . . . . 4-6 RATINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7 1. DETERMINE BOILER LOCATION Provide Air Openings to Room . . . . . . . . . . . . . . . . . . . .10 Flooring and Foundation . . . . . . . . . . . . . . . . . . . . . . . . 10 Residential Garage Installation . . . . . . . . . . . . . . . . . . . .10 Vent and Air Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 Prevent Combustion Air Contamination . . . . . . . . . . . . . . 10 Corrosive Contaminants and Sources . . . . . . . . . . . . . . .11 Using an Existing Vent System to Install a New Boiler . . 11 Removing a Boiler from Existing Common Vent . . . . . . . 12 2. PREPARE BOILER Remove Boiler from Wood Pallet . . . . . . . . . . . . . . . . . .13 Gas Conversions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 Model 400 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 Model 501 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 Models 601 - 801 . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 Leveling the Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 3. GENERAL VENTING Direct Venting Options . . . . . . . . . . . . . . . . . . . . . . . . . . .15-16 Install Vent and Combustion Air Piping . . . . . . . . . . . . . .17 PVC/CPVC Vent Piping Materials . . . . . . . . . . . . . . .17 Requirements for Installation in Canada . . . . . . . . . . . . . 17 Installing Vent or Air Piping . . . . . . . . . . . . . . . . . . . . . . .17-18 PVC/CPVC Air Intake/Vent Connections . . . . . . . . . . . . . 18 Air Inlet Pipe Materials . . . . . . . . . . . . . . . . . . . . . . . . . .19 Stainless Steel Air Intake/Vent Connections . . . . . . . . . . 20 Min./Max. Combustion Air & Vent Piping Lengths . . . . . . 21 Vent and Air Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21 Optional Room Air . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21-22 4. SIDEWALL DIRECT VENTING Vent/Air Termination - Sidewall . . . . . . . . . . . . . . . . . . . .23-26 Determine Location . . . . . . . . . . . . . . . . . . . . . . . . . .23-25 Prepare Wall Penetrations . . . . . . . . . . . . . . . . . . . . .25-26 Termination and Fittings . . . . . . . . . . . . . . . . . . . . . . .26 Multiple Vent/Air Terminations . . . . . . . . . . . . . . . . . .26 Sidewall Termination - Optional Concentric Vent . . . . . . 27-29 5. VERTICAL DIRECT VENTING Vent/Air Termination - Vertical . . . . . . . . . . . . . . . . . . . . .30-31 Determine Location . . . . . . . . . . . . . . . . . . . . . . . . . .30 Prepare Roof Penetrations . . . . . . . . . . . . . . . . . . . . . 31 Termination and Fittings . . . . . . . . . . . . . . . . . . . . . . .31 Multiple Vent/Air Terminations . . . . . . . . . . . . . . . . . .31 Vertical Termination - Optional Concentric Vent . . . . 32-33 Alternate Vertical Concentric Venting . . . . . . . . . . . . 34-35 6. HYDRONIC PIPING System Water Piping Methods . . . . . . . . . . . . . . . . . . . .36 Low Water Cutoff Device . . . . . . . . . . . . . . . . . . . . . . . . .36 Chilled Water System . . . . . . . . . . . . . . . . . . . . . . . . . . .36 Freeze Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36 General Piping Information . . . . . . . . . . . . . . . . . . . . . . .36 Flow Switch and Relief Valve Installation . . . . . . . . . . . . 37 Flow Switch Adjustment . . . . . . . . . . . . . . . . . . . . . . .38 Near Boiler Piping Components . . . . . . . . . . . . . . . . . . .38-39 Circulator Sizing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39 Near Boiler Piping Connections . . . . . . . . . . . . . . . . . . .39 7. GAS CONNECTIONS Connecting Gas Supply Piping . . . . . . . . . . . . . . . . . . . .46 Natural Gas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47 Pipe Sizing for Natural Gas . . . . . . . . . . . . . . . . . . . .47 Natural Gas Supply Pressure Requirements . . . . . . . 47 Propane Gas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47 Pipe Sizing for Propane Gas . . . . . . . . . . . . . . . . . . .47 Propane Supply Pressure Requirements . . . . . . . . . . 47 Check Inlet Gas Supply . . . . . . . . . . . . . . . . . . . . . . . . . .48 Gas Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 Gas Valve Replacement . . . . . . . . . . . . . . . . . . . . . . . . .49 8. FIELD WIRING Line Voltage Connections . . . . . . . . . . . . . . . . . . . . . . . .50 Low Voltage Connections . . . . . . . . . . . . . . . . . . . . . ....
Ce manuel est également adapté pour les modèles :Chauffe-eau - 801 (7.88 mb)