Log:
Évaluations - 3, GPA: 4.7 ( )

Instructions Perlick, Modèle 66134-3

Fabricant : Perlick
Taille : 1.68 mb
Nom Fichier :
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


Adjust the Secondary Air/ CO2 regulator located on the beer pump panel to a minimum operating pressure of 10 psig. Smart Coupler Probe Valve Lever Positions ¦ Connect the coupler to a regulated water supply with pressure less than 30 psig. Note: Pump damage may occur with pressure higher than 30 psig. ¦ Open the water supply. Then open probe valve on Perlick Smart coupler to the 45° position. See figure 2. The beer pump will slowly pump up the beer line in the trunk housing to set psig. Note: If pump continues to run for longer than expected, check lines for possible leaks at one or more of the connections. ¦ Gradually increase secondary regulator pressure to the designed system pressure to achieve a flow rate of one gallon per minute from the dispensing head. Note: maximum beer pump operating pressure is 90 psig. ¦ Open dispensing head faucet to purge air trapped within the tubing. ¦ Check all gas and liquid line fittings and connections for leaks. ¦ Close probe valve on Perlick Smart Coupler. (See figure 1) and disconnect coupler from regulated water source. ¦ Clean beer system. After cleaning and rinsing the system, make sure the beer line is full of cold water (beer dispensing from warm beer lines will be poor quality). ¦ Tap fresh keg with Perlick Smart Coupler. Open dispensing head faucet until clear beer flows. Figure 1 Closed Position Figure 2 45° or Cleaning Position Figure 3Open Position Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Form No. Z2149A Rev. 10.11.06 4 5 Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Diagram #2 – Beer Pump Form No. Z2149A Rev. 10.11.06 6 Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice. Diagram #3 – Cleaning Diagram Form No. Z2149A Rev. 10.11.06 Cleaning Instructions General Information ¦ The cleaning of beer lines with the new integral flow reversal feature incorporated into the Perlick Beer Pump gives the line cleaner numerous configurations for line cleaning. Although the Perlick Beer Pump can be used as an in-line pump for moving the solution from the coupler to the faucet due to its capability of working with negative lift, the following is the recommended method for cleaning beer lines with the Perlick Beer Pump with integral flow reversal installed. Cleaning Beer Lines using Smart Couplers ¦ Disconnect Smart Coupler from beer connector lines and soak Smart Couplers in cleaning solution. ¦ Couple the two beer connectors together using Perlick’s double male adapter part # 186 with beer washers. ¦ Determine which sets of lines will be cleaned together and rotate the Dispense/Reverse Flow handle to the Reverse Flow position on the line which fluid will be circulated from the faucet, to the tap. ¦ Remove the faucet from the line to which the Beer Line Cleaner pump will be ...

Ce manuel est également adapté pour les modèles :
Dispensers - 66134-1 (1.68 mb)
Dispensers - 66134-2 (1.68 mb)
Dispensers - 66134-4 (1.68 mb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories