Log:
Évaluations - 2, GPA: 4.5 ( )

Instructions Zephyr, Modèle AK7548ASX

Fabricant : Zephyr
Taille : 393.09 kb
Nom Fichier : tempest2a_manual.pdf
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


If available, also refer range manufacturer’s height clearance requirements and recommended hood mounting height above range. Vertical Ducting: 6” round minimum (CBI-xxxB blower) 10” round minimum (PBI-1100A and remote blowers) Horizontal Ducting: 3-1/4”x10” minimum (CBI-xxxB blower) No horizontal option available for PBI-1100A or remote blower DAMAGE-SHIPMENT / INSTALLATION: • Please fully inspect unit for damage before installation. • If the unit is damaged in shipment, return the unit to the store in which it was bought for repair or replacement. • If the unit is damaged by the customer, repair or replacement is the responsibility of the customer. • If the unit is damaged by the installer (if other than the customer), repair of replacement must be made by arrangement between customer and installer. 6 WARNING FIRE HAZARD NEVER exhaust air or terminate duct work into spaces between walls, crawl spaces, ceiling, attics or garages. All exhaust must be ducted to the outside. Use metal ductwork only. Fasten all connections with sheet metal screws and tape all joints with certified Silver Tape or Duct Tape. Some Ducting Options Soffit or crawl space Roof Pitch w/ Flashing & Cap Rear Ducting Side wall cap w/ gravity damper External Blower Installation Ducting 7 Installation – Specifi cations 24” (30”) 30” (36”) 42” (48”) 1 3/8” 9 15/16” 2 3/4” 2 3/16” 1 1/8” 8 9/16” 3 7/16” 1 3/16” elec k/o CL 22 5/16” o 9 15/16” 143/16” 103/8” 12 3/8”4 1/4” 13 3/16” 2 5/16” 6 7/16” 2” 2 1/16” CL 5 9/16” ext blwr k/o elec k/o 2 11/16” 12” *10 ” 4” 18” 4 5/16” 29 15/16” (30”) 35 15/16” (36”) 47 15/16” (48”) 24” *10” transition used with dual and external blowers. top side back 8 ELECTRICAL WARNING All Electrical work must by performed by qualified electrician or person with similar technical know how and background. For personal safety, remove house fuse or open circuit breaker before beginning installation. Do not use extension cord or adapter plug with this appliance. Follow national electrical codes or prevailing local codes and ordinances. Electrical Supply: This appliance requires a 120V 60Hz electrical supply, and connected to an individual, properly grounded branch circuit, protected by a 15 or 20 ampere circuit breaker or time delay fuse. Wiring must be 2 wire w/ ground. Please also refer Electrical Diagram labeled on product. Cable Lock: A cable locking connector (not supplied) might also be required by local codes. Check with local requirements and codes, purchase and install appropriate connector if necessary. Cable Lock Installation Electrical 9 10 C/L C/L A B 12 3/8” min 26” wood board 4” fig. 2 fig. 1 C D E fig. 2 - C fig. 2 - E fig. 2 - D NUT SCREW Installation – Mounting the Range Hood 1. Measure distance from range top to hood bottom (26” min) Level and mark line A. 2. Plum and mark center line. 3. Mark mounting height line B. (12 3/8” from line A) (This is the top of the board used to hang the hood) 4. Mark center line of wood board and align top of board with line B. Secure wood board to studs using (4) M4 wood screws. Wood Board Dimensions: (W x D x H) AK7500ASX - 28” x 3/4” x 4” AK7536ASX - 34” x 3/4” x 4” AK7548ASX - 46” x 3/4” x 4” 5. If horizontally ducting hood refer to hood specifi cations on page 8 for cut-out dimensions. 6. *Hang hood on wood board and secure using (4) M4 x 16 screws. 7. Install blower(s). Turn to page 11 for blower installation instructions. 8. Install electrical. 9. Install duct work and duct tape. 10. Power up hood and check for leaks around duct tape. 11. Install optional accessories: duct cover (fi g. 2-C), back splash (fi g. 2- D), and/or heat lamp kit (fi g. 2-E). (sold separately) For more detailed instructions refer to manual included with each accessory. 12. Reinstall baffl e fi lters. NOTE: If installing a back splash do not install screws at bottom of hood yet. There is a lip on the back splash that needs to be inserted behind the hood fi rst. CAUTION: At least two installers are required due to the weight and size of the hood. ! PBI-1100A INTERNAL BLOWER COMPATIBLE WITH 10” ROUND VERTICAL DUCTING ONLY Please turn to page 12 for instructions on installing CBI-xxxB in horizontal ducting mode. 1. Position blower plate over bracket on inside back of hood and pivot up. Secure plate to hood with (2) 10x3/16” screws. (blower pictured is a PBI-1100A) 2. Connect male end of blower wire to female plug in the hood. (plug is located inside the hood behind the control panel) 3.CBI-xxxB Blower – Connect 6” round duct work to blower collar. PBI-110A Blower – Place 10” round adapter on top of hood and secure with (4) M4x8 screws. Connect 10” round duct work to 10” round adapter. Installation CBI-xxxB Internal 11 Installation – CBI-xxxB Horizontal Ducting Conversion HORIZONTAL DUCTING IS ONLY AVAILABLE IF USING THE CBI-290B / CBI-600B SINGLE INTERNAL BLOWER. 1. Unscrew (4) screws holding blower to plate and remove blower. 2. Co...

Ce manuel est également adapté pour les modèles :
Ventilateurs - AK7536ASX (393.09 kb)
Ventilateurs - AK7500ASX (393.09 kb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories