Log:
Évaluations - 1, GPA: 4 ( )

Instructions Zephyr, Modèle AHZ-M90ABX

Fabricant : Zephyr
Taille : 2.16 mb
Nom Fichier :
Langue d'enseignement: en
Aller à la télécharger



Facilité d'utilisation


However, if required, it is possible to have the exhaust air discharged from the top. This can be accomplished by carrying out the steps indicated in the following paragraphs; upon reaching step 5, the blower plate must be rotated and installed in the opposite direction. The following instructions are for preparing the hood for use with an external or in-line blowers models CBE-1000 or PBN-1000A. CAUTION: To reduce the risk of fi re and electric shock, install this rangehood only with remote blowers rated maximum 6.2 A. For internal blower instructions please turn to page 10. 1. Unclip the top cover. Fig.1 2. Remove the metal blower plate by striking it with the aid of a slotted screwdriver Fig.2 3. Remove the (6) screws securing the blower plate to the blower housing and remove blower plate. See.Fig.3 4. Install the flange and fix it to the blower plate with the (4 type B) screws. Fig 4 Installation - External & In-Line Blower Preparation - 13 - 5. Install the plate with the fl ange facing the wall, inside the motor casing: carry out the instructions at stage 3 in reverse order then use the screws provided to complete installation. (Tot. 12 type B). (Note! If air is discharged from the top, rotate the plate and install it in the opposite direction with the fl ange facing upwards) Fig.5 6. Put the top cover back on. 7. Open the fl ap Fig.6 8. With the aid of a slotted screwdriver, break the grommet of circular hole through which the wires pass. Fig. 7 9. Insert the female connector in the terminal box already attached to the hood. Fig. 8A Installation - External & In-Line Blower Preparation - 14 - Pass the wires of the remote motor through the terminal box hole and connect them to the connector wires. Fig.8B Note: Carry out the power supplly connection in accordance with the national electric code, ANSI/NFPA 70-1999. Note1: A cable lock (not included) may be required by local codes. Please review local codes for more information. 11. Attach 6 pin male molex connectors to 6 pin female molex connectors inside blower housing. See Fig. 9 Note2: Check local codes to determine minimum wire gauge. See manual included with external and in-line blower for instructions on installing the blower. Installation - External & In-Line Blower Preparation - 15 - Installation - Ducting Options WARNING FIRE HAZARD NEVER exhaust air or terminate duct work into spaces between walls, crawl spaces, ceiling, attics or garages. All exhaust must be ducted to the outside, unless using the recirculating option. Use single wall rigid Metal ductwork only. Fasten all connections with sheet metal screws and tape all joints w/ certifi ed Silver Tape or Duct Tape. Some Ducting Options - 16 - MOUNTING HEIGHTS The range hood must be installed at a minimum height of 22 inches (56 cm) from the cooking surface. If a connecting duct work composed of two parts is used, the upper part must be placed outside the lower part. Do not connect the range hood duct to the same duct used to exhaust hot air or fumes from another appliance. Before proceeding with the assembly instructions remove the decorative mesh filters so that the range hood is easier to handle. MOUNTING TO THE WALL 1. Place the paper template included with Installation your hood on the wall to determine where to add the screws for mounting the hood. Make sure that the line at the bottom of the template is aligned with the edge of the rear lower corner of the hood. Fig. 13 Note! Cut out holes for ducting if venting out the back. Drill holes for the power supply and the remote blower power supply (if required), using the measurements indicated in Fig.14 2. Fix the power supply conduit to the hole on the hood. If the hood has an external motor, fix the motor’s power supply conduit to the hole on the hood as well. Fig.15 - 17 - Installation - Mounting the Range Hood 3. Lift the hood onto the screws (type D) and adjust to make sure the hood is level. 4. When the hood has been adjusted tighten the screws to secure the hood in place. NOTE: Screws must be fastened into wooden studs so wood blocking may be necessary. If using wall anchors make sure to check your local codes for suitability and type of anchors to use. NOTE1: For the various installations use screws and screw anchors suited to the type of wall (minimum screw size: 1/4" diameter x 2-3/4" length). NOTE2: The following Duct Cover kits are available as acessories: Z1C-00HZ and Z1C-01HZ. - 18 - Installation - Power Supply Connection GENERAL • Carefully read the following important information regarding installation safety and maintenance. Keep this information booklet accessible for further consultations. POWER SUPPLY CONNECTION For connection to the power supply refer to the following: 1. Open the fl ap Fig.16 2. Remove the power supply cover by undoing the (2) screws Fig. 17. 3. Connect the wires of the hood to those of the power supply as described. Fig.18 : BLACK = L li...

Ce manuel est également adapté pour les modèles :
Ventilateurs - AHZ-M90ARX (2.16 mb)
Ventilateurs - AHZ-M90AWX (2.16 mb)

Écrivez votre propre critique du dispositif



Texte du message
Votre nom :
Entrez les deux chiffres :
capcha





catégories