![](/images/flag/s/en.gif)
(NOTE: Do Not tighten).. Attach PEC DEC UPRIGHT(2) and PRESS UPRIGHT(3) to TOP FRAME(10) each using two 3/8"X3" HEX HEAD BOLT(78), four 3/8" WASHER(90) and two 3/8" NYLON.. NUT(87). .. Please check the TOP FRAME(10) is EVENLY seated on CENTER UPRIGHT(4), PRESS UPRIGHT(3) and PEC DEC UPRIGHT(2) and tighten all bolts and nuts GRADUALLY, not individually. Attach AB PULLEY TUBE(11a) to PRESS UPRIGHT(3) using two 3/8" x 3" HEX HEAD BOLT(78), four 3/8" WASHER(90) and two 3/8" NYLON NUT(87). 9 STEP 4 A