
3. Connect the Auto-Chlor Chlorine Generator to the Load 1 & 2 connectors of the Auxiliary Relay to control the generator’s operation. 4. Bonding is recommended and may be required by local code. The bonding lug is found on the bottom of the Control Box. 5. Set the chlorine generator to 100% power, and program the Aux Relay to run the chlorine generator as needed. (e.g. 100%, 50%, 25% of the time the pump is running). 240Volt Circulation Pump With 240 Volt Chlorine Generator 120Volt Circulation