,)$ + $71% . . ,)$ + $71% . and Double- Run and Single- Wall Wall Terminal 8B85< . 1. B B. . . ,1 . % ** . ,1 . %3 '* . %3 '* . :4 ' 10. % ** . 10. *% -. :4 . *% -. 7&!=,. %% 33. 7&!=,%> . %% 33. %> 1 . 1. . %0. %3'* . . * 5) Horizontal Vent Terminal Clearances 3'* % . Structure Minimum Clearances for Vent Termination Location (all directions unless specified) Forced air inlet within 10 ft (3.1m) 3 ft (0.9m) above Combustion air inlet of another applian6 ft (1
If it is determined that the blower CFM is greater than allowed or desirable, see Paragraph 14 for instructions on determining the correct size of bypass duct required. To determine temperature rise, the inlet and outlet air temperatures should be measured at points not affected by heat radiating from the heat exchanger. The following charts show the approved temperature rise range with the required CFM and the internal pressure drop for each size of unit. Model EEDU (80% thermal efficient) Size
Pages 1-18 Optional Accessories ................................ Paragraphs 19-21 .. Pages 19-21 Check Installation and Start-Up ........................ Paragraph 22 .. Pages 22-23 Index By Page No. Belt Drive ............................................. 15 Blower Motor and Drive ...................... 15 Check/Test/Start-Up ............................. 22 Clearances ................................................ 2 Combustion Air ...................................... 4 Combustion Air Provi
Installation and Operation ........................ 1-26 .......................... 1-20 Check Installation and Start-Up .............. 27 ............................. 21 Service/Maintenance/Troubleshooting ..... 28-33 ........................ 22-24 Index by Page Number Air Flow Requirements ................................. 13 Coupling Two, Three, Four or Five Mounting the Furnace .................................... 6 Blower Connections ..................................... 14 Furnaces ......
2 Maintenance Schedule ................... 2 1A. Blower Bearings .............................. 3 1B. Blower Belts ................................... 3 2. Filters ................................................. 3 3. Manifold Gas Pressure ...................... 3 4. Air Pressure ....................................... 4 5. Circuit Indicator Board (check lights) 4 6. Main Burner and Pilot Assembly ...... 4 OPERATION/SERVICE SECTION ................... 5-15 Controls - Location ..................