
CABLEASSEMBLY (90) through openings in BASE (10) as shown in FIGURE 1. • Securely assemble two 3-1/2" PULLEYS (79) into BASE (10) using two 3/8 X 2-3/4" BOLTS (38), four 3/8" FLANGE SPACERS (66), and two 3/8” LOCKNUTS (48). (NOTE: Make sure LEG EXT. CABLE ASSEMBLY (90) is routed under PULLEYS and BOLTS.) • Slide LEG EXT. CABLE ASSEMBLY (90) through the opening in the end of the BASE (10) as shown in FIGURE 1. • Insert four 3/4" FLANGE BEARINGS (69) into tubes on REAR UPRIGHT (16) as shown in